Crane Assembly/Disassembly Director

For crane assembly directors and crew: who directs the work, which procedures apply, how to brief the crew, and how to control pins, booms, blocking, brakes, outriggers and rigging.

Based on OSHA 29 CFR 1926.1403 through 1926.1406 · about 7 min read

Need proof of training? The full course (30 min) adds practice questions, a job scenario, the final quiz and a certificate your employer can verify.

Take the course
Who directs and which procedures

The A/D director

Assembly and disassembly must be directed by an A/D director. The rule gives two ways to meet it:

If one person alone is doing the assembly/disassembly, that person must meet the criteria for both and is considered the A/D director.

Reference: 29 CFR 1926.1404(a)(1) · 29 CFR 1926.1404(a)(2)

Who directs and which procedures

Manufacturer or employer procedures

The employer must follow all applicable manufacturer prohibitions and use either:

The A/D director must understand the procedures and must review them immediately before the work starts, unless the director understands them and has already applied them to the same type and configuration of equipment (including accessories, if any).

Reference: 29 CFR 1926.1403 · 29 CFR 1926.1406(a) · 29 CFR 1926.1406(b) · 29 CFR 1926.1404(b) · 29 CFR 1926.1404(c) · 29 CFR 1926.1403(a) · 29 CFR 1926.1403(b) · 29 CFR 1926.1406(a)(2) · 29 CFR 1926.1406(a)(3)

Briefing and protecting the crew

Brief the crew before work starts

Before work begins, the A/D director must ensure each crew member understands:

The same requirements must be met again during the job: before a crew member takes on a different task, and when new personnel are added during the operations.

Reference: 29 CFR 1926.1404(d)(1) · 29 CFR 1926.1404(d)(2)

Briefing and protecting the crew

Out of the operator's view

Crew memberBefore going somewhere out of the operator's view that is in, on or under the equipment, or near the equipment or load where movement could injure you, inform the operator you are going there.
OperatorWhen you know a crew member went to such a location, do not move any part of the equipment or load until you are informed, through a pre-arranged system of communication, that the crew member is in a safe position.

Reference: 29 CFR 1926.1404(e)(1) · 29 CFR 1926.1404(e)(2)

Pins, booms and jibs

Not under the boom while pins come out

Reference: 29 CFR 1926.1404(f)(1) · 29 CFR 1926.1404(f)(2) · 29 CFR 1926.1404(j)

Pins, booms and jibs

Dismantling booms and jibs: pins and support

When dismantling booms and jibs (including to change their length), these rules apply to both manufacturer and employer procedures:

Reference: 29 CFR 1926.1405(a) · 29 CFR 1926.1405(b) · 29 CFR 1926.1405(c) · 29 CFR 1926.1405(d)

Hazards the director must address

Ground, blocking, capacity and weights

The A/D director must address the hazards associated with the operation. The rule lists: site and ground bearing conditions, blocking material, proper location of blocking, verifying assist crane loads, boom and jib pick points, center of gravity, stability upon pin removal, snagging, struck by counterweights, boom hoist brake failure, loss of backward stability, and wind speed and weather. This page and the next explain several of them, along with the separate rules on capacity limits and component weights:

Reference: 29 CFR 1926.1404(h) · 29 CFR 1926.1404(h)(1) · 29 CFR 1926.1404(h)(2) · 29 CFR 1926.1404(h)(3) · 29 CFR 1926.1404(h)(4) · 29 CFR 1926.1404(h)(6)(ii) · 29 CFR 1926.1404(g) · 29 CFR 1926.1404(k) · 29 CFR 1926.1404(h)(3)(i) · 29 CFR 1926.1404(h)(5) · 29 CFR 1926.1404(h)(9) · 29 CFR 1926.1404(h)(11)

Hazards the director must address

Brakes, pins, snagging and weather

Reference: 29 CFR 1926.1404(h)(10) · 29 CFR 1926.1404(h)(7) · 29 CFR 1926.1404(h)(8) · 29 CFR 1926.1404(h)(12)

Outriggers, rigging and finishing the job

Outriggers and stabilizers

Whenever outriggers or stabilizers are used, these requirements apply:

Reference: 29 CFR 1926.1404(q) · 29 CFR 1926.1404(q)(1) · 29 CFR 1926.1404(q)(2) · 29 CFR 1926.1404(q)(3) · 29 CFR 1926.1404(q)(4) · 29 CFR 1926.1404(q)(5)(ii) · 29 CFR 1926.1404(q)(5)(i) · 29 CFR 1926.1404(q)(6)

Outriggers, rigging and finishing the job

Rigging, shipping pins and inspection

Reference: 29 CFR 1926.1404(r)(1) · 29 CFR 1926.1404(r)(2) · 29 CFR 1926.1403 · 29 CFR 1926.1404(o) · 29 CFR 1926.1404(m)(2) · 29 CFR 1926.1404(r)(3)

Need proof of training? The full course (30 min) adds practice questions, a job scenario, the final quiz and a certificate your employer can verify.

Take the course

Sources

Fact-checked against the regulation text on October 09, 2026. This certificate records completion of awareness training based on OSHA 29 CFR 1926.1403, 1926.1404, 1926.1405 and 1926.1406. It is not an OSHA card or license and does not make anyone an A/D director, competent person, qualified person or qualified rigger; the employer decides who meets those criteria. These four sections contain no training requirement of their own. Your employer must still ensure that assembly/disassembly is directed by an A/D director who meets 29 CFR 1926.1404(a); that the A/D director understands the applicable manufacturer or employer procedures for the specific equipment (1926.1403, 1926.1404(b)) and ensures that crew members understand their tasks, the hazards associated with their tasks and the hazardous positions/locations that they need to avoid (1926.1404(d)); and that rigging work for assembly/disassembly is done by a qualified rigger (1926.1404(r)(1)).

This guide explains the rule in plain words. Always read the regulation itself and your employer's site-specific procedures.