Overhead and Gantry Crane Safety (General Industry)

For operators of overhead and gantry cranes, including pendant-operated bridge cranes: designated operators, rated load markings, frequent and periodic inspections, rope inspection, maintenance lockout, handling the load safely and the shift limit switch check.

Based on OSHA 29 CFR 1910.179 · about 4 min read

Need proof of training? The full course (30 min) adds practice questions, a job scenario, the final quiz and a certificate your employer can verify.

Take the course
Operators and markings

Who operates, and what the crane shows

Reference: 29 CFR 1910.179(b)(1) · 29 CFR 1910.179(b)(5) · 29 CFR 1910.179(b)(8) · 29 CFR 1910.179(i) · 29 CFR 1910.179(g)(3) · 29 CFR 1910.179(g)(1)(v)

Inspections

Frequent and periodic inspections

Reference: 29 CFR 1910.179(j) · 29 CFR 1910.179(j)(2)(ii) · 29 CFR 1910.179(j)(3)(ii) · 29 CFR 1910.179(j)(3)(iii) · 29 CFR 1910.179(j)(3)(iv) · 29 CFR 1910.179(j)(3)(vi) · 29 CFR 1910.179(j)(4)(iii)

Inspections

Rope inspection

All running ropes get a thorough inspection at least once a month, with a certification record (date, inspector's signature and rope identifier). Conditions that can mean appreciable loss of strength include reduced diameter, broken outside wires, worn outside wires, corroded or broken wires at end connections, damaged end connections, and severe kinking, crushing, cutting or unstranding.

Rope idle for a month or more is thoroughly inspected by an appointed person before it is used.

Reference: 29 CFR 1910.179(m) · 29 CFR 1910.179(m)(1) · 29 CFR 1910.179(m)(1)(i) · 29 CFR 1910.179(m)(1)(iii) · 29 CFR 1910.179(m)(1)(iv) · 29 CFR 1910.179(m)(1)(v) · 29 CFR 1910.179(m)(2)

Maintenance

Before and after repairs

A preventive maintenance program based on the manufacturer's recommendations is established. Before adjustments and repairs:

  1. Run the crane to where it will cause the least interference.
  2. Put all controllers in the off position.
  3. Open and lock the main or emergency switch in the open position.
  4. Place warning or out of order signs on the crane, and on the floor beneath or on the hook where visible from the floor.
  5. Where other cranes run on the same runway, use rail stops or other means to prevent interference.

Unsafe conditions found in inspection are corrected before operation resumes, by designated personnel only. After repairs, the crane is not operated until guards are reinstalled, safety devices reactivated and maintenance equipment removed.

Reference: 29 CFR 1910.179(l) · 29 CFR 1910.179(l)(2)(i)(a) · 29 CFR 1910.179(l)(2)(i)(d)

Handling the load

Rigging and lifting

Reference: 29 CFR 1910.179(n)(1) · 29 CFR 1910.179(n)(2) · 29 CFR 1910.179(n)(3) · 29 CFR 1910.179(n)(2)(ii) · 29 CFR 1910.179(n)(2)(iii) · 29 CFR 1910.179(n)(3)(iii)

Handling the load

Brakes, wraps, signals and the limit switch

Reference: 29 CFR 1910.179(n)(3) · 29 CFR 1910.179(n)(4) · 29 CFR 1910.179(n)(4)(i)

Need proof of training? The full course (30 min) adds practice questions, a job scenario, the final quiz and a certificate your employer can verify.

Take the course

Sources

Fact-checked against the regulation text on October 09, 2026. This certificate records completion of awareness training based on OSHA 29 CFR 1910.179(b)(1), (b)(5), (b)(8), (g)(1)(v), (g)(3)(vii), (i), (j), (l), (m) and (n). It is not an OSHA card or license, and it does not designate anyone to operate a crane. Section 1910.179 has no general operator training requirement. Instead, your employer must permit only designated personnel to operate a crane covered by the section (1910.179(b)(8)), meaning people selected or assigned by the employer or the employer's representative as being qualified to perform specific duties (1910.179(a)(35)), and must insure that operators are familiar with the operation and care of fire extinguishers provided (1910.179(o)(3)). When two or more cranes lift one load, one qualified responsible person must instruct all personnel involved in the proper positioning, rigging of the load, and the movements to be made (1910.179(n)(3)(ix)).

This guide explains the rule in plain words. Always read the regulation itself and your employer's site-specific procedures.