Stanley Engineered Fastening LLC: OSHA inspection 348696865
OSHA inspections and violations, searchable by company, state, ZIP, industry (NAICS) and penalty. Data is copied nightly from the U.S. Department of Labor.
Open case Planned inspection
Stanley Engineered Fastening LLC OSHA violations & penalties
- Violations
- 12
- Proposed penalty
- $32,000
- Willful
- 0
- Repeat
- 1
- Serious
- 10
OSHA opened inspection 348696865 at Stanley Engineered Fastening LLC in Troy, MI on January 20, 2026 (planned inspection). The record lists 12 violations (1 repeat, 10 serious), with $32,000 in proposed penalties and $16,000 current. The most-cited rule was 29 CFR 1910.147, The control of hazardous energy (lockout/tagout) (2 citations). The case is still open, so penalties can change if it is contested or settled.
Penalties by citation type
OSHA standards cited in this inspection
Each rule links to its plain-English page with the official text, how often OSHA cites it nationwide, and training that covers it.
State-plan standard
1 citation · $2,250
State-plan standard
1 citation · $2,250
State-plan standard
1 citation · $2,250
State-plan standard
1 citation · $2,250
State-plan standard
1 citation · $2,250
State-plan standard
1 citation · $250
State-plan standard
1 citation · $0
State-plan standard
1 citation · $0
Don’t be the next inspection on this list
Most of these citations trace back to training, competent-person oversight and written programs. Fix those before OSHA arrives.
All 12 citations
Cited standards as published by the source, not predicted violations. “Abate by” is the date OSHA set for the hazard to be fixed.
| Citation | Standard | Type | Exposed | Initial penalty | Current penalty | Abate by |
|---|---|---|---|---|---|---|
| 01001 | 1910.28(b)(1)(i) | Serious | 1 | $4.500,00 | $2.250,00 | Not provided |
| 01002A | 408.12461(1) | Serious | 1 | $4.500,00 | $2.250,00 | June 5, 2026 |
| 01002B | 408.12412(1) | Serious | 1 | $0,00 | $0,00 | June 5, 2026 |
| 01002C | 408.12434(2) | Serious | 1 | $0,00 | $0,00 | June 5, 2026 |
| 01003 | 408.12618(1) | Serious | 2 | $4.500,00 | $2.250,00 | June 5, 2026 |
| 01004 | 408.12635(1) | Serious | 1 | $4.500,00 | $2.250,00 | June 5, 2026 |
| 01005 | 408.12645(1) | Serious | 1 | $4.500,00 | $2.250,00 | June 5, 2026 |
| 01006 | 408.16234(8) | Serious | 1 | $4.500,00 | $2.250,00 | June 5, 2026 |
| 01007A | 1910.147(d)(4)(i) | Serious | 2 | $4.500,00 | $2.250,00 | June 5, 2026 |
| 01007B | 1910.147(c)(6)(ii) | Serious | 2 | $0,00 | $0,00 | June 5, 2026 |
| 02001 | 1910.1200(h)(3) Training | Other-than-serious | 1 | $0,00 | $0,00 | June 5, 2026 |
| 03001 | 408.12154(1) | Repeat | 4 | $500,00 | $250,00 | June 5, 2026 |
Questions about this inspection
How much was Stanley Engineered Fastening LLC fined by OSHA?
For inspection 348696865, OSHA proposed $32,000 in penalties; the current penalty is $16,000. The case is open, so the final amount may change.
What OSHA standards was Stanley Engineered Fastening LLC cited for?
Most-cited sections in this inspection, with citation counts: 29 CFR 1910.147 (The control of hazardous energy (lockout/tagout)): 2; 29 CFR 1910.28 (Duty to have fall protection and falling object protection): 1; state-plan code: 1; state-plan code: 1; state-plan code: 1.
What do willful and repeat OSHA citations mean?
A willful citation means OSHA found the employer knowingly failed to comply or acted with plain indifference to worker safety. A repeat citation means the employer was cited for the same or a substantially similar hazard within the last five years. Both carry the highest penalties OSHA can propose.
Is OSHA inspection 348696865 closed?
No. The source lists the case as open. Citations can be contested, and penalties often change at an informal conference or settlement.