29 CFR 1910 · General Industry · Subpart H

1910.119(d)(3)(i)(B): Piping and Instrument Diagrams for PSM

By Black Belt Safety Editorial Team Official text as of octubre 15, 2026 Data updated octubre 21, 2026 2 min read

In plain words:

Under process safety management, the process safety information on the equipment in the process must include piping and instrument diagrams (P&IDs).

Key takeaways

  • 1910.119(d)(3)(i)(B) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart H).
  • OSHA cited it 30 times in the last 3 years, in 30 inspections, with $256,813 in current penalties.
  • Most citations: TX (4), WI (3), NY (3).
  • Related part: 1910.119(d) Process safety information (190 citations).
  • Free 5-minute toolbox talk for your crew below.
30citations, 3 years
$256,813current penalties
30inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1910.119(d)(3)(i)(B) is one requirement inside 1910.119 Process safety management of highly hazardous chemicals, an OSHA general industry standard (Part 1910, Subpart H). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(B) Piping and instrument diagrams (P&ID's); 30 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1910.119.

Where and how often it was cited

YearCitations
202410
202514
20266

Top states: TX (4), WI (3), NY (3), PA (2), VA (2)

Largest penalties

EmployerLocationPenalty for this rule
ACCURATE ENERGETIC SYSTEMS, LLCMC EWEN, TN$70,000
DELEK REFINING, LTD.TYLER, TX$30,000
ALDI INC. (WISCONSIN)OAK CREEK, WI$16,550
BLUE CUBE OPERATIONS LLCFREEPORT, TX$16,550
FULLER INDUSTRIES, INC.GREAT BEND, KS$16,147

Free toolbox talk

A 5-minute crew talk on 1910.119(d)(3)(i)(B), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1910.119(d)(3)(i)(B).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

What are P&IDs?

Piping and instrument diagrams that show the process piping and instruments.

Are P&IDs required under PSM?

Yes. They are part of the required process safety information on equipment.

Which standard is this?

1910.119, Process safety management of highly hazardous chemicals.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Desplácese hacia arriba