29 CFR 1910 · General Industry · Subpart H

1910.119(i): Pre-Startup Safety Review

By Black Belt Safety Editorial Team Official text as of octubre 15, 2026 Data updated noviembre 5, 2026 3 min read

In plain words:

Employers must perform a pre-startup safety review for new facilities and for modified facilities when the change is significant enough to require a change in process safety information. Before highly hazardous chemicals are introduced, the review must confirm construction and equipment meet design specifications, procedures are in place and adequate, hazard analysis recommendations are resolved or management of change is met, and operator training is complete.

Key takeaways

  • 1910.119(i) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart H).
  • OSHA cited it 22 times in the last 3 years, in 18 inspections, with $221,036 in current penalties.
  • Most citations: TN (5), OH (4), OR (2).
  • Related part: 1910.119(i)(1) (15 citations).
  • Free 5-minute toolbox talk for your crew below.

Get the free 5-minute toolbox talk on 1910.119(i) ↓

22citations, 3 years
$221,036current penalties
18inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1910.119(i) ("Pre-startup safety review") is one requirement inside 1910.119 Process safety management of highly hazardous chemicals, an OSHA general industry standard (Part 1910, Subpart H). It includes 6 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(i) Pre-startup safety review. 22 citations

(1) The employer shall perform a pre-startup safety review for new facilities and for modified facilities when the modification is significant enough to require a change in the process safety information. Open (i)(1) 15 citations

(2) The pre-startup safety review shall confirm that prior to the introduction of highly hazardous chemicals to a process: 7 citations

(i) Construction and equipment is in accordance with design specifications;

(ii) Safety, operating, maintenance, and emergency procedures are in place and are adequate; 5 citations

(iii) For new facilities, a process hazard analysis has been performed and recommendations have been resolved or implemented before startup; and modified facilities meet the requirements contained in management of change, paragraph (l). 2 citations

(iv) Training of each employee involved in operating a process has been completed.

Source: eCFR, text current as of 2026-10-15. Read all of 1910.119.

See every company cited for this rule.

Export the list: 18 inspections cited 1910.119(i) in the last 3 years, with employer, location, penalty and date.

Purple Belt, $59/mo

Where and how often it was cited

YearCitations
20231
20247
20256
20268

Top states: TN (5), OH (4), OR (2), WI (1), FL (1)

Largest penalties

EmployerLocationPenalty for this rule
ACCURATE ENERGETIC SYSTEMS, LLCMC EWEN, TN$140,000
PPG INDUSTRIES, INC.CIRCLEVILLE, OH$16,131
AMERICAN NITRILE OPERATIONS, LLC.GROVE CITY, OH$11,823
GOLDEN GATE PETROLEUM OF COLORADO, LLCFRUITA, CO$11,585

Free toolbox talk

A 5-minute crew talk on 1910.119(i), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1910.119(i).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

When is a pre-startup safety review required?

For new facilities, and for modified facilities when the modification is significant enough to require a change in process safety information.

What must the review confirm?

That construction and equipment meet design specifications, procedures are in place and adequate, hazard analysis or management of change requirements are met, and operator training is complete.

When must the review happen?

Prior to the introduction of highly hazardous chemicals to the process.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Desplácese hacia arriba