1910.147(e)(2): Clear and Notify Before Restart
After lockout or tagout work, the work area must be checked to make sure all employees are safely positioned or removed. After lockout or tagout devices are removed and before the machine is started, affected employees must be told the devices have been removed.
Key takeaways
- 1910.147(e)(2) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart J).
- OSHA cited it 35 times in the last 3 years, in 33 inspections, with $220,020 in current penalties.
- 2 deaths are linked to inspections that cited this rule.
- Most citations: WI (7), OH (6), FL (3).
- Related part: 1910.147(e) Release from lockout or tagout (75 citations).
- Free 5-minute toolbox talk for your crew below.
In this article
What this rule covers
29 CFR 1910.147(e)(2) ("Employees") is one requirement inside 1910.147 The control of hazardous energy (lockout/tagout), an OSHA general industry standard (Part 1910, Subpart J). It includes 2 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.
Official text
(2) Employees. 35 citations
(i) The work area shall be checked to ensure that all employees have been safely positioned or removed. Open (e)(2)(i) 29 citations
(ii) After lockout or tagout devices have been removed and before a machine or equipment is started, affected employees shall be notified that the lockout or tagout device(s) have been removed. 6 citations
Source: eCFR, text current as of 2026-10-15. Read all of 1910.147.
Injuries linked to this rule
2 deaths are linked to inspections where OSHA cited 1910.147(e)(2).
At 1:45 p.m. on August 6, 2024, an employee was involved in lowering an aircraftfrom jacks when the aircraft became unstable. The right wing impacted the employee's torso, trapping him beneath the structure. Responders elevated the airframe to relieve the pressure, but despite resuscitative efforts,…
Full case list with employer, penalty, filters and download is part of OSHA Data (Purple Belt).
Unlock with Purple BeltWhere and how often it was cited
| Year | Citations |
|---|---|
| 2023 | 5 |
| 2024 | 13 |
| 2025 | 10 |
| 2026 | 7 |
Top states: WI (7), OH (6), FL (3), OK (3), PA (2)
Largest penalties
| Employer | Location | Penalty for this rule |
|---|---|---|
| AMENTUM SERVICES, INC. | FORT BELVOIR, VA | $16,550 |
| MOLSON COORS BEVERAGE COMPANY USA LLC | TRENTON, OH | $16,550 |
| IBP SOLUTIONS US, LLC | THORP, WI | $16,550 |
| GREEN BAY PACKAGING INC. | GENEVA, OH | $16,000 |
| SOFIDEL OF AMERICA | HATTIESBURG, MS | $15,970 |
Free toolbox talk
A 5-minute crew talk on 1910.147(e)(2), plus alerts when this rule changes. Free.
OSHA interpretation letters
Related parts of this rule
- 1910.147(e) Release from lockout or tagout 75 citations
- 1910.147(e)(2)(i) 29 citations
- 1910.147(e)(3) Lockout or tagout devices removal 27 citations
- 1910.147(e)(1) The machine or equipment 12 citations
Get your crew competent
Trainers on Black Belt Safety: Marc Harvey, Dana Reyes
Trainers and suppliers: feature your business on this rule for $25/month.
Frequently asked questions
What must be done before restarting after lockout?
Check the work area to ensure all employees have been safely positioned or removed.
Who must be told the locks are off?
Affected employees.
When must they be told?
After the lockout or tagout devices are removed and before the machine or equipment is started.
About this page
Sources
- 29 CFR 1910.147 (eCFR), text current as of 2026-10-15
- U.S. Department of Labor enforcement data: OSHA inspections, citations and accident records, copied nightly; data as of 2026-10-21
3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.
