29 CFR 1910 · General Industry · Subpart N

1910.184(f)(5): When to Remove Wire Rope Slings From Service

By Black Belt Safety Editorial Team Official text as of octubre 15, 2026 Data updated noviembre 6, 2026 3 min read

In plain words:

Wire rope slings must be removed from service immediately if they have ten randomly distributed broken wires in one rope lay or five in one strand in one lay, wear of one-third the original diameter of outside wires, kinking, crushing, bird caging or other distortion, heat damage, damaged end attachments, hooks opened more than 15 percent or twisted more than 10 degrees, or corrosion.

Key takeaways

  • 1910.184(f)(5) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart N).
  • OSHA cited it 19 times in the last 3 years, in 17 inspections, with $50,319 in current penalties.
  • 1 death is linked to inspections that cited this rule.
  • Most citations: OH (5), TX (3), NY (2).
  • Related part: 1910.184(f) Wire-rope slings (39 citations).
  • Free 5-minute toolbox talk for your crew below.

Get the free 5-minute toolbox talk on 1910.184(f)(5) ↓

19citations, 3 years
$50,319current penalties
17inspections
1linked deaths
In this article
  1. What this rule covers
  2. Official text
  3. Injuries linked to this rule
  4. Where and how often it was cited
  5. Free toolbox talk
  6. OSHA interpretation letters
  7. Related parts of this rule
  8. Get your crew competent
  9. Frequently asked questions
  10. About this page

What this rule covers

29 CFR 1910.184(f)(5) ("Removal from service") is one requirement inside 1910.184 Slings, an OSHA general industry standard (Part 1910, Subpart N). It includes 7 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(5) Removal from service. Wire rope slings shall be immediately removed from service if any of the following conditions are present: 19 citations

(i) Ten randomly distributed broken wires in one rope lay, or five broken wires in one strand in one rope lay. 6 citations

(ii) Wear or scraping of one-third the original diameter of outside individual wires.

(iii) Kinking, crushing, bird caging or any other damage resulting in distortion of the wire rope structure. 8 citations

(iv) Evidence of heat damage.

(v) End attachments that are cracked, deformed or worn. 1 citations

(vi) Hooks that have been opened more than 15 percent of the normal throat opening measured at the narrowest point or twisted more than 10 degrees from the plane of the unbent hook. 1 citations

(vii) Corrosion of the rope or end attachments. Open (f)(5)(vii) 2 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1910.184.

See every company cited for this rule.

Export the list: 17 inspections cited 1910.184(f)(5) in the last 3 years, with employer, location, penalty and date.

Purple Belt, $59/mo

Injuries linked to this rule

1 death is linked to inspections where OSHA cited 1910.184(f)(5).

Employee dies of blunt trauma when struck by falling bleeder
2024-11-04 · Fatal · WOODVILLE, MS

At 10:28 p.m. on November 4, 2024, an employee working as an oil well driller for a drilling company was holding pipes to be lifted. The bleeder valve cable that is attached to the elevator broke causing the 30-pound bleeder valve to fall 90 feet…

Where and how often it was cited

YearCitations
20247
20259
20263

Top states: OH (5), TX (3), NY (2), CO (1), MO (1)

Largest penalties

EmployerLocationPenalty for this rule
WHITE RIVER OPERATING, LLCWOODVILLE, MS$11,585
VEHTEK SYSTEMS INC.BOWLING GREEN, OH$8,275
NEXTEEL SAHA, LLCCROSBY, TX$6,951
CHOCTAW SERVICES, LLCLOCO HILLS, NM$6,622
THREE D METALS, INC.VALLEY CITY, OH$4,500

Free toolbox talk

A 5-minute crew talk on 1910.184(f)(5), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1910.184(f)(5).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

How many broken wires take a sling out of service?

Ten randomly distributed broken wires in one rope lay, or five broken wires in one strand in one rope lay.

When is a hook too damaged?

When opened more than 15 percent of the normal throat opening at the narrowest point, or twisted more than 10 degrees from the plane of the unbent hook.

Does heat damage count?

Yes. Evidence of heat damage requires immediate removal from service.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Desplácese hacia arriba