1910.244(a)(2)(iii): Secure Jacked Loads Right Away
Employers must make sure that once a load has been raised with a jack, it is cribbed, blocked or otherwise secured at once.
Key takeaways
- 1910.244(a)(2)(iii) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart P).
- OSHA cited it 33 times in the last 3 years, in 33 inspections, with $209,857 in current penalties.
- 6 deaths are linked to inspections that cited this rule.
- Most citations: OH (4), TX (3), NM (2).
- Related part: 1910.244(a) Jacks (476 citations).
- Free 5-minute toolbox talk for your crew below.
In this article
What this rule covers
29 CFR 1910.244(a)(2)(iii) is one requirement inside 1910.244 Other portable tools and equipment, an OSHA general industry standard (Part 1910, Subpart P). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.
Official text
(iii) After the load has been raised, it shall be cribbed, blocked, or otherwise secured at once. 33 citations
Source: eCFR, text current as of 2026-10-15. Read all of 1910.244.
Injuries linked to this rule
6 deaths are linked to inspections where OSHA cited 1910.244(a)(2)(iii).
At 10:30 a.m. on November 13, 2024, an employee working as a the mechanic shop foreman for an automobile parts store had just returned from his morning break. The employee and a coworker working as a foreman had begun working on a vehicle together. The…
Full case list with employer, penalty, filters and download is part of OSHA Data (Purple Belt).
Unlock with Purple BeltWhere and how often it was cited
| Year | Citations |
|---|---|
| 2023 | 1 |
| 2024 | 13 |
| 2025 | 9 |
| 2026 | 10 |
Top states: OH (4), TX (3), NM (2), GA (2), FL (2)
Largest penalties
| Employer | Location | Penalty for this rule |
|---|---|---|
| WILLIAMS BROTHERS CONSTRUCTION CO., INC. | WILLIS, TX | $16,550 |
| FAST FLEET, LLC DBA FAST FLEET MOBILE TRUCK REPAIR | ATLANTA, GA | $16,131 |
| CLEAR CREEK SKIING CORPORATION | GEORGETOWN, CO | $14,000 |
| L & M TOWING AND REPAIR, INC. | VERMILION, OH | $12,412 |
| CELINA ALUMINUM PRECISION TECHNOLOGY, INC. | CELINA, OH | $12,000 |
Free toolbox talk
A 5-minute crew talk on 1910.244(a)(2)(iii), plus alerts when this rule changes. Free.
OSHA interpretation letters
None exist. OSHA has not published a letter of interpretation for 1910.244(a)(2)(iii).
Related parts of this rule
- 1910.244(a) Jacks 476 citations
- 1910.244(a)(1) Loading and marking 307 citations
- 1910.244(a)(1)(ii) 303 citations
- 1910.244(a)(2) Operation and maintenance 169 citations
- 1910.244(a)(2)(vi) 123 citations
- 1910.244(a)(1)(i) 4 citations
- 1910.244(a)(2)(v) 1 citations
- 1910.244(a)(2)(vii)
Get your crew competent
Trainers on Black Belt Safety: Marc Harvey, Dana Reyes
Trainers and suppliers: feature your business on this rule for $25/month.
Frequently asked questions
What must be done after a load is jacked up?
It must be cribbed, blocked or otherwise secured at once.
Can I work under a load held only by a jack?
The rule requires the load to be secured at once after raising, so do not rely on the jack alone.
What counts as securing the load?
Cribbing, blocking or another method that secures it.
About this page
Sources
- 29 CFR 1910.244 (eCFR), text current as of 2026-10-15
- U.S. Department of Labor enforcement data: OSHA inspections, citations and accident records, copied nightly; data as of 2026-10-20
3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.
