1910.269(u)(5): Guarding of energized parts
Key takeaways
- 1910.269(u)(5) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart R).
- Related part: 1910.269(u) Substations (1 citations).
- Free 5-minute toolbox talk for your crew below.
Get the free 5-minute toolbox talk on 1910.269(u)(5) ↓
In this article
What this rule covers
29 CFR 1910.269(u)(5) ("Guarding of energized parts") is one requirement inside 1910.269 Electric power generation, transmission, and distribution, an OSHA general industry standard (Part 1910, Subpart R). It includes 3 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.
Official text
(5) Guarding of energized parts.
(i) The employer shall provide guards around all live parts operating at more than 150 volts to ground without an insulating covering unless the location of the live parts gives sufficient clearance (horizontal, vertical, or both) to minimize the possibility of accidental employee contact.
American National Standard National Electrical Safety Code, ANSI/IEEE C2-2002 contains guidelines for the dimensions of clearance distances about electric equipment in substations. Installations meeting the ANSI provisions comply with paragraph (u)(5)(i) of this section. The Occupational Safety and Health Administration will determine whether an installation that does not conform to this ANSI standard complies with paragraph (u)(5)(i) of this section based on the following criteria:
(1) Whether the installation conforms to the edition of ANSI C2 that was in effect when the installation was made,
(2) Whether each employee is isolated from energized parts at the point of closest approach; and
(3) Whether the precautions taken when employees perform work on the installation provide protection equivalent to the protection provided by horizontal and vertical clearances meeting ANSI/IEEE C2-2002.
(ii) Except for fuse replacement and other necessary access by qualified persons, the employer shall maintain guarding of energized parts within a compartment during operation and maintenance functions to prevent accidental contact with energized parts and to prevent dropped tools or other equipment from contacting energized parts.
(iii) Before guards are removed from energized equipment, the employer shall install barriers around the work area to prevent employees who are not working on the equipment, but who are in the area, from contacting the exposed live parts.
Source: eCFR, text current as of 2026-10-15. Read all of 1910.269.
Free toolbox talk
A 5-minute crew talk on 1910.269(u)(5), plus alerts when this rule changes. Free.
OSHA interpretation letters
None exist. OSHA has not published a letter of interpretation for 1910.269(u)(5).
Related parts of this rule
- 1910.269(u) Substations 1 citations
- 1910.269(u)(4) Guarding of rooms and other spaces containing electric supply equipment 1 citations
Get your crew competent
Trainers on Black Belt Safety: Marc Harvey
Trainers and suppliers: feature your business on this rule for $25/month.
About this page
Sources
- 29 CFR 1910.269 (eCFR), text current as of 2026-10-15
- U.S. Department of Labor enforcement data: OSHA inspections, citations and accident records, copied nightly
3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.
