29 CFR 1910 · General Industry · Subpart S

1910.303(a): Approved Electrical Equipment

By Black Belt Safety Editorial Team Official text as of octubre 15, 2026 Data updated noviembre 1, 2026 3 min read

In plain words:

Employers may use conductors and equipment required or permitted by the electrical subpart only if they are approved, as defined in 1910.399.

Key takeaways

  • 1910.303(a) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart S).
  • OSHA cited it 15 times in the last 3 years, in 15 inspections, with $34,587 in current penalties.
  • 1 death is linked to inspections that cited this rule.
  • Most citations: NV (9), NJ (2), AL (1).
  • Free 5-minute toolbox talk for your crew below.

Get the free 5-minute toolbox talk on 1910.303(a) ↓

15citations, 3 years
$34,587current penalties
15inspections
1linked deaths
In this article
  1. What this rule covers
  2. Official text
  3. Injuries linked to this rule
  4. Where and how often it was cited
  5. Free toolbox talk
  6. OSHA interpretation letters
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1910.303(a) ("Approval") is one requirement inside 1910.303 General, an OSHA general industry standard (Part 1910, Subpart S). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(a) Approval. The conductors and equipment required or permitted by this subpart shall be acceptable only if approved, as defined in § 1910.399. 15 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1910.303.

See every company cited for this rule.

Export the list: 15 inspections cited 1910.303(a) in the last 3 years, with employer, location, penalty and date.

Purple Belt, $59/mo

Injuries linked to this rule

1 death is linked to inspections where OSHA cited 1910.303(a).

Employee is killed in fall from roof
2023-11-16 · Fatal · BOAZ, AL

At 11:50 a.m. on November 16, 2023, an employee was observed standing with one foot on the loading platform and one foot on the top plate of the center wall gable, loading bundles of shingles from the platform to the home. The employee told a…

Where and how often it was cited

YearCitations
20231
20245
20256
20263

Top states: NV (9), NJ (2), AL (1), OR (1), HI (1)

Largest penalties

EmployerLocationPenalty for this rule
SUXESS, INCRENO, NV$8,130
NJDOC SOUTH WOODS STATE PRISONBRIDGETON, NJ$7,000
NJDOC SOUTH WOODS STATE PRISONBRIDGETON, NJ$7,000
KABCO BUILDERS, INC.BOAZ, AL$5,600
SANDER BROTHERS INVESTMENTWELLS, NV$4,965

Free toolbox talk

A 5-minute crew talk on 1910.303(a), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1910.303(a).

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

What electrical equipment is acceptable?

Only conductors and equipment that are approved, as defined in 1910.399.

Where is approved defined?

In 1910.399.

Does this cover conductors too?

Yes. It covers conductors and equipment.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Desplácese hacia arriba