29 CFR 1926 · Construction · Subpart X

1926.1052(b): Temporary Stair Treads

By Black Belt Safety Editorial Team Official text as of octubre 15, 2026 Data updated noviembre 6, 2026 3 min read

In plain words:

Except during stairway construction, employers must not allow foot traffic on pan stairs to be filled later unless they are temporarily filled with wood or other solid material to the top of each pan, or on skeleton metal stairs unless secured temporary treads and landings cover the entire area. Temporary treads must be solid and cover the full width and depth.

Key takeaways

  • 1926.1052(b) is part of OSHA's construction standards (29 CFR Part 1926, Subpart X).
  • OSHA cited it 58 times in the last 3 years, in 52 inspections, with $91,932 in current penalties.
  • 2 deaths are linked to inspections that cited this rule.
  • Most citations: TN (25), NJ (8), IN (6).
  • Related part: 1926.1052(b)(3) (31 citations).
  • Free 5-minute toolbox talk for your crew below.

Get the free 5-minute toolbox talk on 1926.1052(b) ↓

58citations, 3 years
$91,932current penalties
52inspections
2linked deaths
In this article
  1. What this rule covers
  2. Official text
  3. Injuries linked to this rule
  4. Where and how often it was cited
  5. Free toolbox talk
  6. OSHA interpretation letters
  7. Related parts of this rule
  8. Get your crew competent
  9. Frequently asked questions
  10. About this page

What this rule covers

29 CFR 1926.1052(b) ("Temporary service") is one requirement inside 1926.1052 Stairways, an OSHA construction standard (Part 1926, Subpart X). It includes 3 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(b) Temporary service. The following requirements apply to all stairways as indicated: 58 citations

(1) Except during stairway construction, foot traffic is prohibited on stairways with pan stairs where the treads and/or landings are to be filled in with concrete or other material at a later date, unless the stairs are temporarily fitted with wood or other solid material at least to the top edge of each pan. Such temporary treads and landings shall be replaced when worn below the level of the top edge of the pan. Open (b)(1) 22 citations

(2) Except during stairway construction, foot traffic is prohibited on skeleton metal stairs where permanent treads and/or landings are to be installed at a later date, unless the stairs are fitted with secured temporary treads and landings long enough to cover the entire tread and/or landing area. 5 citations

(3) Treads for temporary service shall be made of wood or other solid material, and shall be installed the full width and depth of the stair. Open (b)(3) 31 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1926.1052.

See every company cited for this rule.

Export the list: 52 inspections cited 1926.1052(b) in the last 3 years, with employer, location, penalty and date.

Purple Belt, $59/mo

Injuries linked to this rule

2 deaths are linked to inspections where OSHA cited 1926.1052(b).

Employee is crushed by collapsing roof trusses and is killed
2024-11-13 · Fatal · BAXTER, TN

At 12:45 a.m. on November 13, 2024, Employee #1 and a coworker were installing subflooring on the second level of a residential home above the garage, approximately 12 feet from the ground. Employee #1 was gluing and screwing the subfloor down to the trusses while…

See all 2 cases

Full case list with employer, penalty, filters and download is part of OSHA Data (Purple Belt).

Unlock with Purple Belt

Where and how often it was cited

YearCitations
20233
202435
202514
20266

Top states: TN (25), NJ (8), IN (6), MN (4), NY (3)

Largest penalties

EmployerLocationPenalty for this rule
EMBREY BUILDERS LLCDENVER, CO$10,000
EMBREY BUILDERS LLCDENVER, CO$9,000
MR. CONCRETE CORP.JERSEY CITY, NJ$7,646
PROBUILD, LLCMARION, IA$4,688
THE PHOENIX ON MAIN URBAN RENEWAL LLCHACKENSACK, NJ$4,148

Free toolbox talk

A 5-minute crew talk on 1926.1052(b), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1926.1052(b).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

Can workers walk on unfilled pan stairs?

Not unless the stairs are temporarily fitted with wood or other solid material at least to the top edge of each pan, except during stairway construction.

What about skeleton metal stairs?

Foot traffic is prohibited unless secured temporary treads and landings cover the entire tread and landing area.

When must temporary pan treads be replaced?

When worn below the level of the top edge of the pan.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Desplácese hacia arriba