1926.1407(e): Voltage information
Key takeaways
- 1926.1407(e) is part of OSHA's construction standards (29 CFR Part 1926, Subpart CC).
- Free 5-minute toolbox talk for your crew below.
In this article
What this rule covers
29 CFR 1926.1407(e) ("Voltage information") is one requirement inside 1926.1407 Power line safety (up to 350 kV)—assembly and disassembly, an OSHA construction standard (Part 1926, Subpart CC). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.
Official text
(e) Voltage information. Where Option (3) of this section is used, the utility owner/operator of the power lines must provide the requested voltage information within two working days of the employer's request.
Source: eCFR, text current as of 2026-10-15. Read all of 1926.1407.
Free toolbox talk
A 5-minute crew talk on 1926.1407(e), plus alerts when this rule changes. Free.
OSHA interpretation letters
Get your crew competent
Trainers on Black Belt Safety: Marc Harvey, Dana Reyes
Trainers and suppliers: feature your business on this rule for $25/month.
About this page
Sources
- 29 CFR 1926.1407 (eCFR), text current as of 2026-10-15
- U.S. Department of Labor enforcement data: OSHA inspections, citations and accident records, copied nightly
3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.
