29 CFR 1926 · Construction · Subpart CC

1926.1416(d): Repairing Category I Crane Operational Aids

By Black Belt Safety Editorial Team Official text as of octubre 15, 2026 Data updated octubre 20, 2026 6 min read

In plain words:

Category I operational aids on cranes that are not working properly must be repaired no later than 7 calendar days after the problem occurs, or within 7 calendar days of receiving parts if the employer documents ordering them within 7 days. Until repaired, temporary alternative measures must be used, such as a boom angle indicator or clearly marking the boom hoist cable for the operator or a spotter, and the same applies to luffing jib limiting devices.

Key takeaways

  • 1926.1416(d) is part of OSHA's construction standards (29 CFR Part 1926, Subpart CC).
  • OSHA cited it 10 times in the last 3 years, in 10 inspections, with $173,535 in current penalties.
  • Most citations: MI (2), GA (2), MD (2).
  • Related part: 1926.1416(d)(3) Anti two-blocking device (10 citations).
  • Free 5-minute toolbox talk for your crew below.
10citations, 3 years
$173,535current penalties
10inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1926.1416(d) ("Category I operational aids and alternative measures") is one requirement inside 1926.1416 Operational aids, an OSHA construction standard (Part 1926, Subpart CC). It includes 15 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(d) Category I operational aids and alternative measures. Operational aids listed in this paragraph that are not working properly must be repaired no later than 7 calendar days after the deficiency occurs. Exception: If the employer documents that it has ordered the necessary parts within 7 calendar days of the occurrence of the deficiency, the repair must be completed within 7 calendar days of receipt of the parts. See § 1926.1417(j) for additional requirements. 10 citations

(1) Boom hoist limiting device.

(i) For equipment manufactured after December 16, 1969, a boom hoist limiting device is required. Temporary alternative measures (use at least one). One or more of the following methods must be used:

(A) Use a boom angle indicator.

(B) Clearly mark the boom hoist cable (so that it can easily be seen by the operator) at a point that will give the operator sufficient time to stop the hoist to keep the boom within the minimum allowable radius. In addition, install mirrors or remote video cameras and displays if necessary for the operator to see the mark.

(C) Clearly mark the boom hoist cable (so that it can easily be seen by a spotter) at a point that will give the spotter sufficient time to signal the operator and have the operator stop the hoist to keep the boom within the minimum allowable radius.

(ii) If the equipment was manufactured on or before December 16, 1969, and is not equipped with a boom hoist limiting device, at least one of the measures in paragraphs (d)(1)(i)(A) through (C) of this section must be used.

(2) Luffing jib limiting device. Equipment with a luffing jib must have a luffing jib limiting device. Temporary alternative measures are the same as in paragraph (d)(1)(i) of this section, except to limit the movement of the luffing jib rather than the boom hoist.

(3) Anti two-blocking device. Open (d)(3) 10 citations

(i) Telescopic boom cranes manufactured after February 28, 1992, must be equipped with a device which automatically prevents damage from contact between the load block, overhaul ball, or similar component, and the boom tip (or fixed upper block or similar component). The device(s) must prevent such damage at all points where two-blocking could occur. 8 citations

Temporary alternative measures: Clearly mark the cable (so that it can easily be seen by the operator) at a point that will give the operator sufficient time to stop the hoist to prevent two-blocking, and use a spotter when extending the boom.

(ii) Lattice boom cranes. 2 citations

(A) Lattice boom cranes manufactured after Feb 28, 1992, must be equipped with a device that either automatically prevents damage and load failure from contact between the load block, overhaul ball, or similar component, and the boom tip (or fixed upper block or similar component), or warns the operator in time for the operator to prevent two-blocking. The device must prevent such damage/failure or provide adequate warning for all points where two-blocking could occur. 2 citations

(B) Lattice boom cranes and derricks manufactured after November 8, 2011 must be equipped with a device which automatically prevents damage and load failure from contact between the load block, overhaul ball, or similar component, and the boom tip (or fixed upper block or similar component). The device(s) must prevent such damage/failure at all points where two-blocking could occur.

(C) Exception. The requirements in paragraphs (d)(3)(ii)(A) and (B) of this section do not apply to such lattice boom equipment when used for dragline, clamshell (grapple), magnet, drop ball, container handling, concrete bucket, marine operations that do not involve hoisting personnel, and pile driving work.

(D) Temporary alternative measures. Clearly mark the cable (so that it can easily be seen by the operator) at a point that will give the operator sufficient time to stop the hoist to prevent two-blocking, or use a spotter.

(iii) Articulating cranes manufactured after December 31, 1999, that are equipped with a load hoist must be equipped with a device that automatically prevents damage from contact between the load block, overhaul ball, or similar component, and the boom tip (or fixed upper block or similar component). The device must prevent such damage at all points where two-blocking could occur. Temporary alternative measures: When two-blocking could only occur with movement of the load hoist, clearly mark the cable (so that it can easily be seen by the operator) at a point that will give the operator sufficient time to stop the hoist to prevent two-blocking, or use a spotter. When two-blocking could occur without movement of the load hoist, clearly mark the cable (so that it can easily be seen by the operator) at a point that will give the operator sufficient time to stop the hoist to prevent two-blocking, and use a spotter when extending the boom.

Source: eCFR, text current as of 2026-10-15. Read all of 1926.1416.

Where and how often it was cited

YearCitations
20232
20242
20254
20262

Top states: MI (2), GA (2), MD (2), NJ (1), SC (1)

Largest penalties

EmployerLocationPenalty for this rule
GRANGAARD CONSTRUCTION, INCMENNO, SD$165,514
NORTH AMERICAN WALL CORPORATIONJERSEY CITY, NJ$2,814
EMTZ FRAMING LLCDAWSONVILLE, GA$2,128
SKY CRANE SERVICES LLCHOSCHTON, GA$1,659
75823 - R - Z CONSTRUCTION LLCSENECA, SC$750

Free toolbox talk

A 5-minute crew talk on 1926.1416(d), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1926.1416(d).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

How fast must a broken boom hoist limiting device be fixed?

No later than 7 calendar days after the deficiency occurs, unless parts were documented as ordered within 7 days, then within 7 days of receiving the parts.

What can be used while waiting for repair?

At least one temporary measure, such as a boom angle indicator or clearly marking the boom hoist cable so the operator or a spotter can see it in time to stop the hoist.

Do older cranes need these measures?

Equipment made on or before December 16, 1969 without a boom hoist limiting device must use at least one of the listed measures.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.