1926.1417(c)(1): Operating Procedures Kept in the Crane Cab
Employers must keep the procedures that apply to operating the equipment, including rated capacities (load charts), recommended operating speeds, special hazard warnings, instructions and the operator's manual, readily available in the cab at all times for the operator.
Key takeaways
- 1926.1417(c)(1) is part of OSHA's construction standards (29 CFR Part 1926, Subpart CC).
- OSHA cited it 12 times in the last 3 years, in 12 inspections, with $51,131 in current penalties.
- Most citations: TX (2), NC (2), NJ (1).
- Related part: 1926.1417(c) Accessibility of procedures (12 citations).
- Free 5-minute toolbox talk for your crew below.
In this article
What this rule covers
29 CFR 1926.1417(c)(1) is one requirement inside 1926.1417 Operation, an OSHA construction standard (Part 1926, Subpart CC). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.
Official text
(1) The procedures applicable to the operation of the equipment, including rated capacities (load charts), recommended operating speeds, special hazard warnings, instructions, and operator's manual, must be readily available in the cab at all times for use by the operator. 12 citations
Source: eCFR, text current as of 2026-10-15. Read all of 1926.1417.
Where and how often it was cited
| Year | Citations |
|---|---|
| 2023 | 2 |
| 2024 | 4 |
| 2025 | 5 |
| 2026 | 1 |
Top states: TX (2), NC (2), NJ (1), AZ (1), GA (1)
Largest penalties
| Employer | Location | Penalty for this rule |
|---|---|---|
| WILLIAMS BROTHERS CONSTRUCTION CO., INC. | WHARTON, TX | $16,550 |
| ELICC AMERICAS CORPORATION | JERSEY CITY, NJ | $15,625 |
| SAMSUNG AIR CONDITIONING | PAGO PAGO, AS | $5,793 |
| TOM-MAC, INC. | WILLIS, TX | $5,647 |
| SERRALLES CONSTRUCTION CORP | COAMO, PR | $2,205 |
Free toolbox talk
A 5-minute crew talk on 1926.1417(c)(1), plus alerts when this rule changes. Free.
OSHA interpretation letters
- OSHA's position on using a crawler crane that has been derated by the crane manufacturer. (2011-07-22)
Related parts of this rule
- 1926.1417(c) Accessibility of procedures 12 citations
Get your crew competent
Trainers on Black Belt Safety: Marc Harvey, Dana Reyes
Trainers and suppliers: feature your business on this rule for $25/month.
Frequently asked questions
Which documents must be in the cab?
Rated capacities (load charts), recommended operating speeds, special hazard warnings, instructions and the operator's manual.
Who are they for?
The operator.
Can they be kept in the site office?
No. They must be readily available in the cab at all times.
About this page
Sources
- 29 CFR 1926.1417 (eCFR), text current as of 2026-10-15
- U.S. Department of Labor enforcement data: OSHA inspections, citations and accident records, copied nightly; data as of 2026-10-20
3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.
