29 CFR 1926 · Construction · Subpart H

1926.251(d): Fiber Rope Slings

By Black Belt Safety Editorial Team Official text as of octubre 15, 2026 Data updated octubre 20, 2026 6 min read

In plain words:

Employers must not use natural or synthetic fiber rope slings beyond the rated capacities marked on the sling. Splices must follow the rope maker's recommendations, with set minimum tucks for manila and synthetic rope, tails that are not trimmed flush, and eyes sized so the angle at the splice is not greater than 60 degrees. Knots must not be used instead of splices.

Key takeaways

  • 1926.251(d) is part of OSHA's construction standards (29 CFR Part 1926, Subpart H).
  • OSHA cited it 7 times in the last 3 years, in 6 inspections, with $34,674 in current penalties.
  • 2 deaths are linked to inspections that cited this rule.
  • Related part: 1926.251(d)(6) Removal from service (4 citations).
  • Free 5-minute toolbox talk for your crew below.
7citations, 3 years
$34,674current penalties
6inspections
2linked deaths
In this article
  1. What this rule covers
  2. Official text
  3. Injuries linked to this rule
  4. Where and how often it was cited
  5. Free toolbox talk
  6. OSHA interpretation letters
  7. Related parts of this rule
  8. Get your crew competent
  9. Frequently asked questions
  10. About this page

What this rule covers

29 CFR 1926.251(d) ("Natural rope, and synthetic fiber") is one requirement inside 1926.251 Rigging equipment for material handling, an OSHA construction standard (Part 1926, Subpart H). It includes 25 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(d) Natural rope, and synthetic fiber. 7 citations

(1) Employers must not use natural- and synthetic-fiber rope slings with loads in excess of the rated capacities (i.e., working load limits) indicated on the sling by permanently affixed and legible identification markings prescribed by the manufacturer. 1 citations

(2) All splices in rope slings provided by the employer shall be made in accordance with fiber rope manufacturers recommendations.

(i) In manila rope, eye splices shall contain at least three full tucks, and short splices shall contain at least six full tucks (three on each side of the centerline of the splice).

(ii) In layed synthetic fiber rope, eye splices shall contain at least four full tucks, and short splices shall contain at least eight full tucks (four on each side of the centerline of the splice).

(iii) Strand end tails shall not be trimmed short (flush with the surface of the rope) immediately adjacent to the full tucks. This precaution applies to both eye and short splices and all types of fiber rope. For fiber ropes under 1-inch diameter, the tails shall project at least six rope diameters beyond the last full tuck. For fiber ropes 1-inch diameter and larger, the tails shall project at least 6 inches beyond the last full tuck. In applications where the projecting tails may be objectionable, the tails shall be tapered and spliced into the body of the rope using at least two additional tucks (which will require a tail length of approximately six rope diameters beyond the last full tuck).

(iv) For all eye splices, the eye shall be sufficiently large to provide an included angle of not greater than 60° at the splice when the eye is placed over the load or support.

(v) Knots shall not be used in lieu of splices.

(3) Safe operating temperatures. Natural and synthetic fiber rope slings, except for wet frozen slings, may be used in a temperature range from minus 20 °F (−28.88 °C) to plus 180 °F (82.2 °C) without decreasing the working load limit. For operations outside this temperature range and for wet frozen slings, the sling manufacturer's recommendations shall be followed.

(4) Splicing. Spliced fiber rope slings shall not be used unless they have been spliced in accordance with the following minimum requirements and in accordance with any additional recommendations of the manufacturer: 1 citations

(i) In manila rope, eye splices shall consist of at least three full tucks, and short splices shall consist of at least six full tucks, three on each side of the splice center line.

(ii) In synthetic fiber rope, eye splices shall consist of at least four full tucks, and short splices shall consist of at least eight full tucks, four on each side of the center line. 1 citations

(iii) Strand end tails shall not be trimmed flush with the surface of the rope immediately adjacent to the full tucks. This applies to all types of fiber rope and both eye and short splices. For fiber rope under 1 inch (2.54 cm) in diameter, the tail shall project at least six rope diameters beyond the last full tuck. For fiber rope 1 inch (2.54 cm) in diameter and larger, the tail shall project at least 6 inches (15.24 cm) beyond the last full tuck. Where a projecting tail interferes with the use of the sling, the tail shall be tapered and spliced into the body of the rope using at least two additional tucks (which will require a tail length of approximately six rope diameters beyond the last full tuck).

(iv) Fiber rope slings shall have a minimum clear length of rope between eye splices equal to 10 times the rope diameter.

(v) Knots shall not be used in lieu of splices.

(vi) Clamps not designed specifically for fiber ropes shall not be used for splicing.

(vii) For all eye splices, the eye shall be of such size to provide an included angle of not greater than 60 degrees at the splice when the eye is placed over the load or support.

(5) End attachments. Fiber rope slings shall not be used if end attachments in contact with the rope have sharp edges or projections.

(6) Removal from service. Natural and synthetic fiber rope slings shall be immediately removed from service if any of the following conditions are present: Open (d)(6) 4 citations

(i) Abnormal wear.

(ii) Powdered fiber between strands.

(iii) Broken or cut fibers. 2 citations

(iv) Variations in the size or roundness of strands.

(v) Discoloration or rotting.

(vi) Distortion of hardware in the sling.

(7) Employers must use natural- and synthetic-fiber rope slings that have permanently affixed and legible identification markings that state the rated capacity for the type(s) of hitch(es) used and the angle upon which it is based, type of fiber material, and the number of legs if more than one. Open (d)(7) 1 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1926.251.

Injuries linked to this rule

2 deaths are linked to inspections where OSHA cited 1926.251(d).

Two employees work in silo and are overcome by vapors; two a
2024-09-07 · Fatal · VOLGA, SD

At 11:30 a.m. on September 7, 2024, Employee #1 and the owner were working inside a silage silo when they were overcome by hazardous vapors. A third employee entered the silo in an attempt to assist them. Employee #1 and the owner sustained fatal asphyxia…

See all 2 cases

Full case list with employer, penalty, filters and download is part of OSHA Data (Purple Belt).

Unlock with Purple Belt

Where and how often it was cited

Free toolbox talk

A 5-minute crew talk on 1926.251(d), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1926.251(d).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

How many tucks does a manila eye splice need?

At least three full tucks, and short splices at least six full tucks.

How many tucks for laid synthetic fiber rope?

Eye splices need at least four full tucks, and short splices at least eight.

Can I tie a knot instead of a splice?

No. Knots shall not be used in lieu of splices.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Desplácese hacia arriba