29 CFR 1926 · Construction · Subpart K

1926.405(a): Wiring Methods

By Black Belt Safety Editorial Team Official text as of octubre 15, 2026 Data updated octubre 20, 2026 6 min read

In plain words:

Employers must make sure metal raceways, cable armor and other metal enclosures are joined into a continuous conductor with effective electrical continuity, and that no wiring is installed in ducts carrying dust, loose stock or flammable vapors or used for vapor removal. Temporary wiring must meet permanent wiring rules unless modified, be removed when no longer needed, with feeders from a distribution center and branch circuits from a power outlet or panelboard.

Key takeaways

  • 1926.405(a) is part of OSHA's construction standards (29 CFR Part 1926, Subpart K).
  • OSHA cited it 235 times in the last 3 years, in 214 inspections, with $254,203 in current penalties.
  • 1 death is linked to inspections that cited this rule.
  • Most citations: VA (44), IN (28), NY (22).
  • Related part: 1926.405(a)(2) Temporary wiring (234 citations).
  • Free 5-minute toolbox talk for your crew below.
235citations, 3 years
$254,203current penalties
214inspections
1linked deaths
In this article
  1. What this rule covers
  2. Official text
  3. Injuries linked to this rule
  4. Where and how often it was cited
  5. Free toolbox talk
  6. OSHA interpretation letters
  7. Related parts of this rule
  8. Get your crew competent
  9. Frequently asked questions
  10. About this page

What this rule covers

29 CFR 1926.405(a) ("Wiring methods") is one requirement inside 1926.405 Wiring methods, components, and equipment for general use, an OSHA construction standard (Part 1926, Subpart K). It includes 17 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(a) Wiring methods. The provisions of this paragraph do not apply to conductors which form an integral part of equipment such as motors, controllers, motor control centers and like equipment. 235 citations

(1) General requirements — 1 citations

(i) Electrical continuity of metal raceways and enclosures. Metal raceways, cable armor, and other metal enclosures for conductors shall be metallically joined together into a continuous electric conductor and shall be so connected to all boxes, fittings, and cabinets as to provide effective electrical continuity. 1 citations

(ii) Wiring in ducts. No wiring systems of any type shall be installed in ducts used to transport dust, loose stock or flammable vapors. No wiring system of any type shall be installed in any duct used for vapor removal or in any shaft containing only such ducts.

(2) Temporary wiring — Open (a)(2) 234 citations

(i) Scope. The provisions of paragraph (a)(2) of this section apply to temporary electrical power and lighting wiring methods which may be of a class less than would be required for a permanent installation. Except as specifically modified in paragraph (a)(2) of this section, all other requirements of this subpart for permanent wiring shall apply to temporary wiring installations. Temporary wiring shall be removed immediately upon completion of construction or the purpose for which the wiring was installed.

(ii) General requirements for temporary wiring. Open (a)(2)(ii) 234 citations

(A) Feeders shall originate in a distribution center. The conductors shall be run as multiconductor cord or cable assemblies or within raceways; or, where not subject to physical damage, they may be run as open conductors on insulators not more than 10 feet (3.05 m) apart. 4 citations

(B) Branch circuits shall originate in a power outlet or panelboard. Conductors shall be run as multiconductor cord or cable assemblies or open conductors, or shall be run in raceways. All conductors shall be protected by overcurrent devices at their ampacity. Runs of open conductors shall be located where the conductors will not be subject to physical damage, and the conductors shall be fastened at intervals not exceeding 10 feet (3.05 m). No branch-circuit conductors shall be laid on the floor. Each branch circuit that supplies receptacles or fixed equipment shall contain a separate equipment grounding conductor if the branch circuit is run as open conductors. Open (a)(2)(ii)(b) 14 citations

(C) Receptacles shall be of the grounding type. Unless installed in a complete metallic raceway, each branch circuit shall contain a separate equipment grounding conductor, and all receptacles shall be electrically connected to the grounding conductor. Receptacles for uses other than temporary lighting shall not be installed on branch circuits which supply temporary lighting. Receptacles shall not be connected to the same ungrounded conductor of multiwire circuits which supply temporary lighting. Open (a)(2)(ii)(c) 23 citations

(D) Disconnecting switches or plug connectors shall be installed to permit the disconnection of all ungrounded conductors of each temporary circuit. 1 citations

(E) All lamps for general illumination shall be protected from accidental contact or breakage. Metal-case sockets shall be grounded. Open (a)(2)(ii)(e) 20 citations

(F) Temporary lights shall not be suspended by their electric cords unless cords and lights are designed for this means of suspension. Open (a)(2)(ii)(f) 20 citations

(G) Portable electric lighting used in wet and/or other conductive locations, as for example, drums, tanks, and vessels, shall be operated at 12 volts or less. However, 120-volt lights may be used if protected by a ground-fault circuit interrupter. Open (a)(2)(ii)(g)

(H) A box shall be used wherever a change is made to a raceway system or a cable system which is metal clad or metal sheathed. 2 citations

(I) Flexible cords and cables shall be protected from damage. Sharp corners and projections shall be avoided. Flexible cords and cables may pass through doorways or other pinch points, if protection is provided to avoid damage. Open (a)(2)(ii)(i) 117 citations

(J) Extension cord sets used with portable electric tools and appliances shall be of three-wire type and shall be designed for hard or extra-hard usage. Flexible cords used with temporary and portable lights shall be designed for hard or extra-hard usage. Open (a)(2)(ii)(j) 33 citations

The National Electrical Code, ANSI/NFPA 70, in Article 400, Table 400-4, lists various types of flexible cords, some of which are noted as being designed for hard or extra-hard usage. Examples of these types of flexible cords include hard service cord (types S, ST, SO, STO) and junior hard service cord (types SJ, SJO, SJT, SJTO).

(iii) Guarding. For temporary wiring over 600 volts, nominal, fencing, barriers, or other effective means shall be provided to prevent access of other than authorized and qualified personnel.

Source: eCFR, text current as of 2026-10-15. Read all of 1926.405.

Injuries linked to this rule

1 death is linked to inspections where OSHA cited 1926.405(a).

Employee dies from electrocution while back feeding vfd
2024-04-04 · Fatal · CHICAGO, IL

At 9:00 a.m. on April 2, 2024, an employee working as a field service technicianfor an electrical contractor was working at a city water plant. The employee wasback feeding a variable frequency drive (VFD) using 480 volts to reform cell capacitors. The work environment had…

Where and how often it was cited

YearCitations
202313
202485
202578
202659

Top states: VA (44), IN (28), NY (22), TN (17), NV (12)

Largest penalties

EmployerLocationPenalty for this rule
SCOTT ELECTRIC COMPANYGOLIAD, TX$10,214
ENGLISH CONSTRUCTION COMPANY, INCORPORATEDFARMVILLE, VA$9,635
INNOMOTICS, LLC.CHICAGO, IL$9,500
HITT CONTRACTING INCCHESTERFIELD, VA$8,715
EMC MECHANICAL SERVICES LLCCHESTERFIELD, VA$8,715

Free toolbox talk

A 5-minute crew talk on 1926.405(a), plus alerts when this rule changes. Free.




OSHA interpretation letters

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

Can wiring be run inside ducts?

No wiring system of any type may be installed in ducts used to transport dust, loose stock or flammable vapors, or in any duct used for vapor removal.

When must temporary wiring be removed?

Immediately upon completion of construction or the purpose for which the wiring was installed.

Where must temporary feeders start?

Feeders shall originate in a distribution center.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Desplácese hacia arriba