29 CFR 1926 · Construction · Subpart P

1926.652(b)(1): Sloping at 1.5 to 1

By Black Belt Safety Editorial Team Official text as of octubre 15, 2026 Data updated octubre 20, 2026 3 min read

In plain words:

Employers who use this option must slope excavations at an angle no steeper than one and one-half horizontal to one vertical (34 degrees measured from the horizontal), unless they use one of the other options. The slopes must be dug to match the Type C soil configurations in appendix B.

Key takeaways

  • 1926.652(b)(1) is part of OSHA's construction standards (29 CFR Part 1926, Subpart P).
  • OSHA cited it 19 times in the last 3 years, in 18 inspections, with $158,106 in current penalties.
  • Most citations: PA (4), AK (3), TX (3).
  • Related part: 1926.652(b) Design of sloping and benching systems (114 citations).
  • Free 5-minute toolbox talk for your crew below.
19citations, 3 years
$158,106current penalties
18inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1926.652(b)(1) ("Option (1)—Allowable configurations and slopes") is one requirement inside 1926.652 Requirements for protective systems, an OSHA construction standard (Part 1926, Subpart P). It includes 2 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(1) Option (1)—Allowable configurations and slopes. 19 citations

(i) Excavations shall be sloped at an angle not steeper than one and one-half horizontal to one vertical (34 degrees measured from the horizontal), unless the employer uses one of the other options listed below. Open (b)(1)(i) 10 citations

(ii) Slopes specified in paragraph (b)(1)(i) of this section, shall be excavated to form configurations that are in accordance with the slopes shown for Type C soil in appendix B to this subpart. 8 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1926.652.

Where and how often it was cited

YearCitations
20231
20243
202510
20265

Top states: PA (4), AK (3), TX (3), VA (2), FL (2)

Largest penalties

EmployerLocationPenalty for this rule
JOHN W. GLEIM JR. INCSHIPPENSBURG, PA$33,100
INDEPENDENCE EXCAVATING, INC.ASHBURN, VA$15,875
MVP PLUMBING CORP.MOUNT PROSPECT, IL$13,902
CROWN CONSTRUCTION, LLCWHEATLAND, WY$11,292
PILLARI BROTHERS CONSTRUCTION CORP.NEWARK, NJ$10,429

Free toolbox talk

A 5-minute crew talk on 1926.652(b)(1), plus alerts when this rule changes. Free.




OSHA interpretation letters

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

What is the standard slope for an excavation under Option 1?

No steeper than one and one-half horizontal to one vertical, which is 34 degrees measured from the horizontal.

What soil type do the Option 1 shapes follow?

The slopes must form configurations shown for Type C soil in appendix B.

Is Option 1 the only way to protect a trench?

No. The employer may use one of the other options listed in the standard instead.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Desplácese hacia arriba