1926.700(b): Definitions applicable to this subpart
Key takeaways
- 1926.700(b) is part of OSHA's construction standards (29 CFR Part 1926, Subpart Q).
- Related part: 1926.700(b)(2) Formwork.
- Free 5-minute toolbox talk for your crew below.
In this article
What this rule covers
29 CFR 1926.700(b) ("Definitions applicable to this subpart") is one requirement inside 1926.700 Scope, application, and definitions applicable to this subpart, an OSHA construction standard (Part 1926, Subpart Q). It includes 9 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.
Official text
(b) Definitions applicable to this subpart. In addition to the definitions set forth in § 1926.32, the following definitions apply to this subpart.
(1) Bull float means a tool used to spread out and smooth concrete.
(2) Formwork means the total system of support for freshly placed or partially cured concrete, including the mold or sheeting (form) that is in contact with the concrete as well as all supporting members including shores, reshores, hardware, braces, and related hardware. Open (b)(2)
(3) Lift slab means a method of concrete construction in which floor, and roof slabs are cast on or at ground level and, using jacks, lifted into position.
(4) Limited access zone means an area alongside a masonry wall, which is under construction, and which is clearly demarcated to limit access by employees.
(5) Precast concrete means concrete members (such as walls, panels, slabs, columns, and beams) which have been formed, cast, and cured prior to final placement in a structure.
(6) Reshoring means the construction operation in which shoring equipment (also called reshores or reshoring equipment) is placed, as the original forms and shores are removed, in order to support partially cured concrete and construction loads.
(7) Shore means a supporting member that resists a compressive force imposed by a load.
(8) Vertical slip forms means forms which are jacked vertically during the placement of concrete.
(9) Jacking operation means the task of lifting a slab (or group of slabs) vertically from one location to another (e.g., from the casting location to a temporary (parked) location, or from a temporary location to another temporary location, or to its final location in the structure), during the construction of a building/structure where the lift-slab process is being used.
[53 FR 22643, June 16, 1988, as amended at 55 FR 42328, Oct. 18, 1990]
Source: eCFR, text current as of 2026-10-15. Read all of 1926.700.
Free toolbox talk
A 5-minute crew talk on 1926.700(b), plus alerts when this rule changes. Free.
OSHA interpretation letters
- Scaffolding/shoring (2005-04-11)
Related parts of this rule
Get your crew competent
Trainers on Black Belt Safety: Marc Harvey, Dana Reyes
Trainers and suppliers: feature your business on this rule for $25/month.
About this page
Sources
- 29 CFR 1926.700 (eCFR), text current as of 2026-10-15
- U.S. Department of Labor enforcement data: OSHA inspections, citations and accident records, copied nightly
3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.