29 CFR 1926 · Construction · Subpart R

1926.752(b): Concrete Strength Before Steel Erection

By Black Belt Safety Editorial Team Official text as of octubre 15, 2026 Data updated octubre 20, 2026 3 min read

In plain words:

A steel erection contractor must not erect steel until it receives written notification that the concrete in footings, piers and walls, or mortar in masonry piers and walls, has reached either 75 percent of the intended minimum compressive design strength or enough strength to support erection loads, based on an appropriate ASTM test of field-cured samples.

Key takeaways

  • 1926.752(b) is part of OSHA's construction standards (29 CFR Part 1926, Subpart R).
  • OSHA cited it 2 times in the last 3 years, in 2 inspections, with $4,200 in current penalties.
  • 1 death is linked to inspections that cited this rule.
  • Free 5-minute toolbox talk for your crew below.
2citations, 3 years
$4,200current penalties
2inspections
1linked deaths
In this article
  1. What this rule covers
  2. Official text
  3. Injuries linked to this rule
  4. Where and how often it was cited
  5. Free toolbox talk
  6. OSHA interpretation letters
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1926.752(b) ("Commencement of steel erection") is one requirement inside 1926.752 Site layout, site-specific erection plan and construction sequence, an OSHA construction standard (Part 1926, Subpart R). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(b) Commencement of steel erection. A steel erection contractor shall not erect steel unless it has received written notification that the concrete in the footings, piers and walls or the mortar in the masonry piers and walls has attained, on the basis of an appropriate ASTM standard test method of field-cured samples, either 75 percent of the intended minimum compressive design strength or sufficient strength to support the loads imposed during steel erection. 2 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1926.752.

Injuries linked to this rule

1 death is linked to inspections where OSHA cited 1926.752(b).

Employee is fatally crushed by steel column
2024-11-20 · Fatal · HUGO, MN

At 1:57 p.m. on November 20, 2024, an employee of Linco Fab Inc was working fromthe ground when a steel column measuring 26 feet long, 14 inches wide, and 5.5 inches deep fell on the employee. The column was anchored by two bolts. The employee…

Where and how often it was cited

Free toolbox talk

A 5-minute crew talk on 1926.752(b), plus alerts when this rule changes. Free.




OSHA interpretation letters

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

What must the steel erector receive before starting?

Written notification that the concrete or mortar has attained the required strength.

What strength is required?

Either 75 percent of the intended minimum compressive design strength or sufficient strength to support the loads imposed during steel erection.

How is strength determined?

On the basis of an appropriate ASTM standard test method of field-cured samples.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Desplácese hacia arriba