29 CFR 1926 · Construction · Subpart R

1926.756(c): OSHA rule

By Black Belt Safety Editorial Team Official text as of octubre 15, 2026 Data updated octubre 20, 2026 3 min read

Key takeaways

  • 1926.756(c) is part of OSHA's construction standards (29 CFR Part 1926, Subpart R).
  • OSHA cited it 1 times in the last 3 years, in 1 inspections, with $1,050 in current penalties.
  • Related part: 1926.756(c)(1) Double connections at columns and/or at beam webs over a column (1 citations).
  • Free 5-minute toolbox talk for your crew below.
1citations, 3 years
$1,050current penalties
1inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. About this page

What this rule covers

29 CFR 1926.756(c) is one requirement inside 1926.756 Beams and columns, an OSHA construction standard (Part 1926, Subpart R). It includes 2 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(c) 1 citations

(1) Double connections at columns and/or at beam webs over a column. When two structural members on opposite sides of a column web, or a beam web over a column, are connected sharing common connection holes, at least one bolt with its wrench-tight nut shall remain connected to the first member unless a shop-attached or field-attached seat or equivalent connection device is supplied with the member to secure the first member and prevent the column from being displaced (See appendix H to this subpart for examples of equivalent connection devices). Open (c)(1) 1 citations

(2) If a seat or equivalent device is used, the seat (or device) shall be designed to support the load during the double connection process. It shall be adequately bolted or welded to both a supporting member and the first member before the nuts on the shared bolts are removed to make the double connection.

Source: eCFR, text current as of 2026-10-15. Read all of 1926.756.

Where and how often it was cited

Free toolbox talk

A 5-minute crew talk on 1926.756(c), plus alerts when this rule changes. Free.




OSHA interpretation letters

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Desplácese hacia arriba