What this rule covers
29 CFR 1926.757(a) ("General") is one requirement inside 1926.757 Open web steel joists, an OSHA construction standard (Part 1926, Subpart R). It includes 21 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.
Official text
(a) General.
(1) Except as provided in paragraph (a)(2) of this section, where steel joists are used and columns are not framed in at least two directions with solid web structural steel members, a steel joist shall be field-bolted at the column to provide lateral stability to the column during erection. For the installation of this joist: Open (a)(1)
(i) A vertical stabilizer plate shall be provided on each column for steel joists. The plate shall be a minimum of 6 inch by 6 inch (152 mm by 152 mm) and shall extend at least 3 inches (76 mm) below the bottom chord of the joist with a 13⁄16 inch (21 mm) hole to provide an attachment point for guying or plumbing cables.
(ii) The bottom chords of steel joists at columns shall be stabilized to prevent rotation during erection.
(iii) Hoisting cables shall not be released until the seat at each end of the steel joist is field-bolted, and each end of the bottom chord is restrained by the column stabilizer plate.
(2) Where constructibility does not allow a steel joist to be installed at the column:
(i) an alternate means of stabilizing joists shall be installed on both sides near the column and shall:
(A) provide stability equivalent to paragraph (a)(1) of this section;
(B) be designed by a qualified person;
(C) be shop installed; and
(D) be included in the erection drawings.
(ii) hoisting cables shall not be released until the seat at each end of the steel joist is field-bolted and the joist is stabilized.
(3) Where steel joists at or near columns span 60 feet (18.3 m) or less, the joist shall be designed with sufficient strength to allow one employee to release the hoisting cable without the need for erection bridging.
(4) Where steel joists at or near columns span more than 60 feet (18.3 m), the joists shall be set in tandem with all bridging installed unless an alternative method of erection, which provides equivalent stability to the steel joist, is designed by a qualified person and is included in the site-specific erection plan. Open (a)(4)
(5) A steel joist or steel joist girder shall not be placed on any support structure unless such structure is stabilized.
(6) When steel joist(s) are landed on a structure, they shall be secured to prevent unintentional displacement prior to installation.
(7) No modification that affects the strength of a steel joist or steel joist girder shall be made without the approval of the project structural engineer of record.
(8) Field-bolted joists. Open (a)(8)
(i) Except for steel joists that have been pre-assembled into panels, connections of individual steel joists to steel structures in bays of 40 feet (12.2 m) or more shall be fabricated to allow for field bolting during erection. Open (a)(8)(i)
(ii) These connections shall be field-bolted unless constructibility does not allow. Open (a)(8)(ii)
(9) Steel joists and steel joist girders shall not be used as anchorage points for a fall arrest system unless written approval to do so is obtained from a qualified person. Open (a)(9)
(10) A bridging terminus point shall be established before bridging is installed. (See appendix C to this subpart.)
Source: eCFR, text current as of 2026-10-15. Read all of 1926.757.
Free toolbox talk
A 5-minute crew talk on 1926.757(a), plus alerts when this rule changes. Free.
OSHA interpretation letters
- Interpretation of OSHA standard CFR 1926.757(a)(1) concerning the angle created by two members framing into a column (2011-02-23)
- Field-bolted joist requirements for solid web structural steel members. (2003-12-15)
- Permissibility of the welding of joists over 40-feet in length, while the hoisting line is kept in place, instead of field bolting. (2003-11-20)
- Applicability of the steel erection standard to repair and installation of metal roofing and roofing accessories. (2002-11-08)
- Field bolting and welding requirements for steel joist assembly (2002-10-22)
- Clarification of steel erection joist field-bolting requirements in 29 CFR Part 1926 Subpart R. (2002-08-15)
- Fall protection requirements of various construction (1926) standards. (2001-09-18)
Related parts of this rule
- 1926.757(a)(9)
- 1926.757(a)(8)(ii)
- 1926.757(a)(8)(i)
- 1926.757(a)(8) Field-bolted joists
- 1926.757(a)(4)
- 1926.757(a)(1)
Get your crew competent
Trainers on Black Belt Safety: Marc Harvey, Dana Reyes
Trainers and suppliers: feature your business on this rule for $25/month.
About this page
Sources
- 29 CFR 1926.757 (eCFR), text current as of 2026-10-15
- U.S. Department of Labor enforcement data: OSHA inspections, citations and accident records, copied nightly
3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.