1926.758(f): OSHA rule
Key takeaways
- 1926.758(f) is part of OSHA's construction standards (29 CFR Part 1926, Subpart R).
- OSHA cited it 2 times in the last 3 years, in 2 inspections, with $140,000 in current penalties.
- Related part: 1926.758(f)(1).
- Free 5-minute toolbox talk for your crew below.
In this article
What this rule covers
29 CFR 1926.758(f) is one requirement inside 1926.758 Systems-engineered metal buildings, an OSHA construction standard (Part 1926, Subpart R). It includes 3 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.
Official text
(f) Both ends of all steel joists or cold-formed joists shall be fully bolted and/or welded to the support structure before: 2 citations
(1) Releasing the hoisting cables; Open (f)(1)
(2) Allowing an employee on the joists; or Open (f)(2)
(3) Allowing any construction loads on the joists. Open (f)(3)
Source: eCFR, text current as of 2026-10-15. Read all of 1926.758.
Where and how often it was cited
Free toolbox talk
A 5-minute crew talk on 1926.758(f), plus alerts when this rule changes. Free.
OSHA interpretation letters
Related parts of this rule
Get your crew competent
Trainers on Black Belt Safety: Marc Harvey, Dana Reyes
Trainers and suppliers: feature your business on this rule for $25/month.
About this page
Sources
- 29 CFR 1926.758 (eCFR), text current as of 2026-10-15
- U.S. Department of Labor enforcement data: OSHA inspections, citations and accident records, copied nightly; data as of 2026-10-20
3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.
