29 CFR 1926 · Construction · Subpart T

1926.850(c): Shut Off Utilities Before Demolition

By Black Belt Safety Editorial Team Official text as of octubre 15, 2026 Data updated octubre 20, 2026 3 min read

In plain words:

Before demolition starts, all electric, gas, water, steam, sewer and other service lines must be shut off, capped or otherwise controlled outside the building line, and any involved utility company must be notified in advance.

Key takeaways

  • 1926.850(c) is part of OSHA's construction standards (29 CFR Part 1926, Subpart T).
  • OSHA cited it 13 times in the last 3 years, in 13 inspections, with $92,870 in current penalties.
  • Most citations: FL (3), OR (2), VA (2).
  • Free 5-minute toolbox talk for your crew below.
13citations, 3 years
$92,870current penalties
13inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Get your crew competent
  7. Frequently asked questions
  8. About this page

What this rule covers

29 CFR 1926.850(c) is one requirement inside 1926.850 Preparatory operations, an OSHA construction standard (Part 1926, Subpart T). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(c) All electric, gas, water, steam, sewer, and other service lines shall be shut off, capped, or otherwise controlled, outside the building line before demolition work is started. In each case, any utility company which is involved shall be notified in advance. 13 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1926.850.

Where and how often it was cited

YearCitations
20248
20254
20261

Top states: FL (3), OR (2), VA (2), MO (1), OH (1)

Largest penalties

EmployerLocationPenalty for this rule
GREENHEART COMPANIES LLCYOUNGSTOWN, OH$16,131
JAMES G DAVIS CONSTRUCTION CORPORATIONARLINGTON, VA$15,875
SMART CONSTRUCTION LLCARLINGTON, VA$15,875
ATLAS WRECKING CORP.DORAL, FL$6,452
CLEAR SPAN STRUCTURES, LLCDORAL, FL$6,452

Free toolbox talk

A 5-minute crew talk on 1926.850(c), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1926.850(c).

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

Which utilities must be controlled before demolition?

All electric, gas, water, steam, sewer and other service lines.

Where must they be controlled?

Outside the building line.

Must the utility company be told?

Yes. Any utility company involved must be notified in advance.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Desplácese hacia arriba