29 CFR 1910 · General Industry · Subpart H

1910.120(b)(4)(ii): Elements

By Black Belt Safety Editorial Team Official text as of octubre 15, 2026 Data updated noviembre 6, 2026 3 min read

Key takeaways

  • 1910.120(b)(4)(ii) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart H).
  • OSHA cited it 2 times in the last 3 years, in 2 inspections, with $0 in current penalties.
  • Related part: 1910.120(b) Safety and health program (14 citations).
  • Free 5-minute toolbox talk for your crew below.

Get the free 5-minute toolbox talk on 1910.120(b)(4)(ii) ↓

2citations, 3 years
$0current penalties
2inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. About this page

What this rule covers

29 CFR 1910.120(b)(4)(ii) ("Elements") is one requirement inside 1910.120 Hazardous waste operations and emergency response, an OSHA general industry standard (Part 1910, Subpart H). It includes 10 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(ii) Elements. The site safety and health plan, as a minimum, shall address the following: 2 citations

(A) A safety and health risk or hazard analysis for each site task and operation found in the workplan. 1 citations

(B) Employee training assignments to assure compliance with paragraph (e) of this section.

(C) Personal protective equipment to be used by employees for each of the site tasks and operations being conducted as required by the personal protective equipment program in paragraph (g)(5) of this section.

(D) Medical surveillance requirements in accordance with the program in paragraph (f) of this section.

(E) Frequency and types of air monitoring, personnel monitoring, and environmental sampling techniques and instrumentation to be used, including methods of maintenance and calibration of monitoring and sampling equipment to be used.

(F) Site control measures in accordance with the site control program required in paragraph (d) of this section.

(G) Decontamination procedures in accordance with paragraph (k) of this section.

(H) An emergency response plan meeting the requirements of paragraph (l) of this section for safe and effective responses to emergencies, including the necessary PPE and other equipment.

(I) Confined space entry procedures.

(J) A spill containment program meeting the requirements of paragraph (j) of this section.

Source: eCFR, text current as of 2026-10-15. Read all of 1910.120.

See every company cited for this rule.

Export the list: 2 inspections cited 1910.120(b)(4)(ii) in the last 3 years, with employer, location, penalty and date.

Purple Belt, $59/mo

Where and how often it was cited

Free toolbox talk

A 5-minute crew talk on 1910.120(b)(4)(ii), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1910.120(b)(4)(ii).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey

Trainers and suppliers: feature your business on this rule for $25/month.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Desplácese hacia arriba