29 CFR 1910 · General Industry · Subpart R

1910.269(l)(8)(ii): OSHA rule

By Black Belt Safety Editorial Team Official text as of octubre 15, 2026 Data updated octubre 24, 2026 3 min read

Key takeaways

  • 1910.269(l)(8)(ii) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart R).
  • OSHA cited it 3 times in the last 3 years, in 3 inspections, with $12,145 in current penalties.
  • Related part: 1910.269(l) Working on or near exposed energized parts (75 citations).
  • Free 5-minute toolbox talk for your crew below.
3citations, 3 years
$12,145current penalties
3inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. About this page

What this rule covers

29 CFR 1910.269(l)(8)(ii) is one requirement inside 1910.269 Electric power generation, transmission, and distribution, an OSHA general industry standard (Part 1910, Subpart R). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(ii) For each employee exposed to hazards from electric arcs, the employer shall make a reasonable estimate of the incident heat energy to which the employee would be exposed. 3 citations

Appendix E to this section provides guidance on estimating available heat energy. The Occupational Safety and Health Administration will deem employers following the guidance in appendix E to this section to be in compliance with paragraph (l)(8)(ii) of this section. An employer may choose a method of calculating incident heat energy not included in appendix E to this section if the chosen method reasonably predicts the incident energy to which the employee would be exposed.

This paragraph does not require the employer to estimate the incident heat energy exposure for every job task performed by each employee. The employer may make broad estimates that cover multiple system areas provided the employer uses reasonable assumptions about the energy-exposure distribution throughout the system and provided the estimates represent the maximum employee exposure for those areas. For example, the employer could estimate the heat energy just outside a substation feeding a radial distribution system and use that estimate for all jobs performed on that radial system.

Source: eCFR, text current as of 2026-10-15. Read all of 1910.269.

Where and how often it was cited

Free toolbox talk

A 5-minute crew talk on 1910.269(l)(8)(ii), plus alerts when this rule changes. Free.




OSHA interpretation letters

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Desplácese hacia arriba