29 CFR 1910 · General Industry · Subpart S

1910.305(a)(2)(i): Allowed Uses of Temporary Wiring

By Black Belt Safety Editorial Team Official text as of octubre 15, 2026 Data updated octubre 20, 2026 3 min read

In plain words:

Temporary electrical power and lighting installations of 600 volts, nominal, or less may be used only during remodeling, maintenance or repair of buildings, structures or equipment and similar work; for no more than 90 days for Christmas decorative lighting, carnivals and similar purposes; or for experimental or development work and during emergencies.

Key takeaways

  • 1910.305(a)(2)(i) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart S).
  • OSHA cited it 77 times in the last 3 years, in 77 inspections, with $88,145 in current penalties.
  • Most citations: OR (23), MI (11), NJ (9).
  • Related part: 1910.305(a) Wiring methods (382 citations).
  • Free 5-minute toolbox talk for your crew below.
77citations, 3 years
$88,145current penalties
77inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1910.305(a)(2)(i) is one requirement inside 1910.305 Wiring methods, components, and equipment for general use, an OSHA general industry standard (Part 1910, Subpart S). It includes 3 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(i) Temporary electrical power and lighting installations of 600 volts, nominal, or less may be used only as follows: 77 citations

(A) During and for remodeling, maintenance, or repair of buildings, structures, or equipment, and similar activities; 4 citations

(B) For a period not to exceed 90 days for Christmas decorative lighting, carnivals, and similar purposes; or Open (a)(2)(i)(b) 10 citations

(C) For experimental or development work, and during emergencies.

Source: eCFR, text current as of 2026-10-15. Read all of 1910.305.

Where and how often it was cited

YearCitations
20239
202423
202531
202614

Top states: OR (23), MI (11), NJ (9), NC (8), MA (5)

Largest penalties

EmployerLocationPenalty for this rule
MFA INC.AURORA, MO$11,823
LARK HOTELS, LLCSARATOGA SPRINGS, NY$7,093
PAVERO COLD STORAGE CORP.HIGHLAND, NY$6,775
VALLEY PARK ELEMENTARY SCHOOLPENNSVILLE, NJ$6,000
DO & CO BOSTON CATERING, INC.BOSTON, MA$6,000

Free toolbox talk

A 5-minute crew talk on 1910.305(a)(2)(i), plus alerts when this rule changes. Free.




OSHA interpretation letters

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

When can temporary wiring be used?

During remodeling, maintenance or repair and similar activities; up to 90 days for holiday lighting, carnivals and similar; or for experimental work and emergencies.

How long can holiday lighting stay up as temporary wiring?

For a period not to exceed 90 days.

What voltage does this cover?

Temporary installations of 600 volts, nominal, or less.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Desplácese hacia arriba