29 CFR 1910 · General Industry · Subpart S

1910.305(a)(2)(ii): Removing Temporary Wiring

By Black Belt Safety Editorial Team Official text as of octubre 15, 2026 Data updated octubre 20, 2026 2 min read

In plain words:

Employers must remove temporary wiring immediately once the project or purpose it was installed for is finished.

Key takeaways

  • 1910.305(a)(2)(ii) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart S).
  • OSHA cited it 27 times in the last 3 years, in 27 inspections, with $32,020 in current penalties.
  • Most citations: MI (4), AK (3), GA (3).
  • Related part: 1910.305(a) Wiring methods (382 citations).
  • Free 5-minute toolbox talk for your crew below.
27citations, 3 years
$32,020current penalties
27inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1910.305(a)(2)(ii) is one requirement inside 1910.305 Wiring methods, components, and equipment for general use, an OSHA general industry standard (Part 1910, Subpart S). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(ii) Temporary wiring shall be removed immediately upon completion of the project or purpose for which the wiring was installed. 27 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1910.305.

Where and how often it was cited

YearCitations
20236
20249
20258
20264

Top states: MI (4), AK (3), GA (3), OR (2), NJ (2)

Largest penalties

EmployerLocationPenalty for this rule
SUTTON TRANSPORT, INC. - ST. LOUISSAINT LOUIS, MO$6,914
MUNICIPALITY OF ANCHORAGEANCHORAGE, AK$6,696
CAMDEN CITY PUBLIC WORKSCAMDEN, NJ$6,300
HATCH VALLEY VENTURES, LLCGARFIELD, NM$4,500
CENTRO INCORPORATEDDAVENPORT, IA$3,795

Free toolbox talk

A 5-minute crew talk on 1910.305(a)(2)(ii), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1910.305(a)(2)(ii).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

When must temporary wiring be taken down?

Immediately upon completion of the project or purpose for which it was installed.

Can temporary wiring be left up for the next job?

No. The rule requires removal immediately once its project or purpose is complete.

Who is responsible?

The employer must make sure the temporary wiring is removed.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Desplácese hacia arriba