29 CFR 1926 · Construction · Subpart K

1926.404(f)(6): Permanent and Continuous Grounding Path

By Black Belt Safety Editorial Team Official text as of octubre 15, 2026 Data updated octubre 20, 2026 2 min read

In plain words:

Employers must make sure the path to ground from circuits, equipment and enclosures is permanent and continuous.

Key takeaways

  • 1926.404(f)(6) is part of OSHA's construction standards (29 CFR Part 1926, Subpart K).
  • OSHA cited it 234 times in the last 3 years, in 234 inspections, with $207,534 in current penalties.
  • Most citations: NC (42), MD (38), NY (34).
  • Related part: 1926.404(f) Grounding (241 citations).
  • Free 5-minute toolbox talk for your crew below.
234citations, 3 years
$207,534current penalties
234inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1926.404(f)(6) ("Grounding path") is one requirement inside 1926.404 Wiring design and protection, an OSHA construction standard (Part 1926, Subpart K). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(6) Grounding path. The path to ground from circuits, equipment, and enclosures shall be permanent and continuous. 234 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1926.404.

Where and how often it was cited

YearCitations
202317
202483
202586
202648

Top states: NC (42), MD (38), NY (34), VA (19), TX (10)

Largest penalties

EmployerLocationPenalty for this rule
CONWAY-PHILLIPS HOLDING, LLCPETROLIA, PA$16,550
F. L. CRANE & SONS, INC.NORTH LITTLE ROCK, AR$9,316
COMFORT SYSTEMS USA (ARKANSAS), INC.NORTH LITTLE ROCK, AR$8,711
NELSON ELECTRIC COMPANY, INC.CARSON CITY, NV$6,857
AS CARIBE DRYWALL INC.MAYAGUEZ, PR$5,627

Free toolbox talk

A 5-minute crew talk on 1926.404(f)(6), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1926.404(f)(6).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

What kind of grounding path is required?

The path to ground must be permanent and continuous.

What does the grounding path rule cover?

Circuits, equipment and enclosures.

Can the ground path be broken temporarily?

No. The rule requires a permanent and continuous path.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Desplácese hacia arriba