1926.451(f)(17): OSHA rule
Key takeaways
- 1926.451(f)(17) is part of OSHA's construction standards (29 CFR Part 1926, Subpart L).
- OSHA cited it 1 times in the last 3 years, in 1 inspections, with $3,500 in current penalties.
- Related part: 1926.451(f) Use (1,221 citations).
- Free 5-minute toolbox talk for your crew below.
In this article
What this rule covers
29 CFR 1926.451(f)(17) is one requirement inside 1926.451 General requirements, an OSHA construction standard (Part 1926, Subpart L). It includes 6 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.
Official text
(17) To reduce the possibility of welding current arcing through the suspension wire rope when performing welding from suspended scaffolds, the following precautions shall be taken, as applicable: 1 citations
(i) An insulated thimble shall be used to attach each suspension wire rope to its hanging support (such as cornice hook or outrigger). Excess suspension wire rope and any additional independent lines from grounding shall be insulated;
(ii) The suspension wire rope shall be covered with insulating material extending at least 4 feet (1.2 m) above the hoist. If there is a tail line below the hoist, it shall be insulated to prevent contact with the platform. The portion of the tail line that hangs free below the scaffold shall be guided or retained, or both, so that it does not become grounded;
(iii) Each hoist shall be covered with insulated protective covers;
(iv) In addition to a work lead attachment required by the welding process, a grounding conductor shall be connected from the scaffold to the structure. The size of this conductor shall be at least the size of the welding process work lead, and this conductor shall not be in series with the welding process or the work piece; Open (f)(17)(iv)
(v) If the scaffold grounding lead is disconnected at any time, the welding machine shall be shut off; and
(vi) An active welding rod or uninsulated welding lead shall not be allowed to contact the scaffold or its suspension system.
Source: eCFR, text current as of 2026-10-15. Read all of 1926.451.
Where and how often it was cited
Free toolbox talk
A 5-minute crew talk on 1926.451(f)(17), plus alerts when this rule changes. Free.
OSHA interpretation letters
- Grounding precautions for arc welding from suspended scaffolds. (1998-12-10)
- Arc welding from suspended scaffolds: feasibility of grounding. (1998-01-13)
Related parts of this rule
- 1926.451(f) Use 1,221 citations
- 1926.451(f)(3) 506 citations
- 1926.451(f)(7) 407 citations
- 1926.451(f)(6) 108 citations
- 1926.451(f)(15) 62 citations
- 1926.451(f)(4) 57 citations
- 1926.451(f)(14) 39 citations
- 1926.451(f)(1) 15 citations
- 1926.451(f)(15)(ii) 10 citations
- 1926.451(f)(12) 6 citations
- 1926.451(f)(13) 5 citations
- 1926.451(f)(5) 5 citations
Get your crew competent
Trainers on Black Belt Safety: Marc Harvey, Dana Reyes
Trainers and suppliers: feature your business on this rule for $25/month.
About this page
Sources
- 29 CFR 1926.451 (eCFR), text current as of 2026-10-15
- U.S. Department of Labor enforcement data: OSHA inspections, citations and accident records, copied nightly; data as of 2026-10-20
3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.
