1910.184(e)(2)(ii): No Makeshift Links on Chain Slings
Employers must not use makeshift links or fasteners formed from bolts or rods, or other such attachments, on alloy steel chain slings.
Key takeaways
- 1910.184(e)(2)(ii) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart N).
- OSHA cited it 9 times in the last 3 years, in 9 inspections, with $28,400 in current penalties.
- Related part: 1910.184(e) Alloy steel chain slings (297 citations).
- Free 5-minute toolbox talk for your crew below.
Get the free 5-minute toolbox talk on 1910.184(e)(2)(ii) ↓
In this article
What this rule covers
29 CFR 1910.184(e)(2)(ii) is one requirement inside 1910.184 Slings, an OSHA general industry standard (Part 1910, Subpart N). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.
Official text
(ii) Makeshift links or fasteners formed from bolts or rods, or other such attachments, shall not be used. 9 citations
Source: eCFR, text current as of 2026-10-15. Read all of 1910.184.
Export the list: 9 inspections cited 1910.184(e)(2)(ii) in the last 3 years, with employer, location, penalty and date.
Purple Belt, $59/moWhere and how often it was cited
Free toolbox talk
A 5-minute crew talk on 1910.184(e)(2)(ii), plus alerts when this rule changes. Free.
OSHA interpretation letters
None exist. OSHA has not published a letter of interpretation for 1910.184(e)(2)(ii).
Related parts of this rule
- 1910.184(e) Alloy steel chain slings 297 citations
- 1910.184(e)(3) Inspections 132 citations
- 1910.184(e)(1) Sling identification 119 citations
- 1910.184(e)(3)(ii) 57 citations
- 1910.184(e)(3)(i) 55 citations
- 1910.184(e)(3)(iii) 18 citations
- 1910.184(e)(4) Proof testing 16 citations
- 1910.184(e)(2) Attachments 16 citations
- 1910.184(e)(9) Deformed attachments 11 citations
- 1910.184(e)(2)(i) 7 citations
- 1910.184(e)(7) Repairing and reconditioning alloy steel chain slings 3 citations
- 1910.184(e)(7)(i) 3 citations
Get your crew competent
Trainers on Black Belt Safety: Marc Harvey
Trainers and suppliers: feature your business on this rule for $25/month.
Frequently asked questions
Can I use a bolt as a link in a chain sling?
No. Makeshift links or fasteners formed from bolts or rods shall not be used.
Are other improvised attachments allowed?
No. Other such attachments shall not be used either.
What slings does this cover?
Alloy steel chain slings.
About this page
Sources
- 29 CFR 1910.184 (eCFR), text current as of 2026-10-15
- U.S. Department of Labor enforcement data: OSHA inspections, citations and accident records, copied nightly; data as of 2026-11-17
3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.
