29 CFR 1910 · General Industry · Subpart O

1910.217(e)(1)(i): Power Press Inspection and Records

By Black Belt Safety Editorial Team Official text as of October 15, 2026 Data updated November 17, 2026 3 min read

In plain words:

Employers must regularly inspect each power press, including the clutch/brake mechanism, antirepeat feature and single-stroke mechanism, to make sure all parts and safeguards are in safe condition. Needed maintenance or repair must be completed before operation, and a certification record must show the date, the signature of the person who did the work, and the press's serial number or other identifier.

Key takeaways

  • 1910.217(e)(1)(i) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart O).
  • OSHA cited it 48 times in the last 3 years, in 48 inspections, with $82,293 in current penalties.
  • Most citations: MN (10), IL (7), WI (4).
  • Related part: 1910.217(e) Inspection, maintenance, and modification of presses (67 citations).
  • Free 5-minute toolbox talk for your crew below.

Get the free 5-minute toolbox talk on 1910.217(e)(1)(i) ↓

48citations, 3 years
$82,293current penalties
48inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1910.217(e)(1)(i) is one requirement inside 1910.217 Mechanical power presses, an OSHA general industry standard (Part 1910, Subpart O). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(i) Under the general component of the inspection program, the employer shall: 48 citations

(A) Conduct periodic and regular inspections of each power press to ensure that all of its parts, auxiliary equipment, and safeguards, including the clutch/brake mechanism, antirepeat feature, and single-stroke mechanism, are in a safe operating condition and adjustment;

(B) Perform and complete necessary maintenance or repair, or both, before operating the press; and

(C) Maintain a certification record of each inspection, and each maintenance and repair task performed, under the general component of the inspection program that includes the date of the inspection, maintenance, or repair work, the signature of the person who performed the inspection, maintenance, or repair work, and the serial number, or other identifier, of the power press inspected, maintained, and repaired.

Source: eCFR, text current as of 2026-10-15. Read all of 1910.217.

See every company cited for this rule.

Export the list: 48 inspections cited 1910.217(e)(1)(i) in the last 3 years, with employer, location, penalty and date.

Purple Belt, $59/mo

Where and how often it was cited

YearCitations
20234
202411
202519
202614

Top states: MN (10), IL (7), WI (4), PA (4), OH (4)

Largest penalties

EmployerLocationPenalty for this rule
110671 - RAHNS CUSTOM MANUFACTURING INCMINNEAPOLIS, MN$15,750
WISCONSIN STAMPING & MANUFACTURING, LLCGERMANTOWN, WI$14,063
FIRST BRANDS GROUP, LLCGREENVILLE, OH$13,000
ELECTRO SWITCH CORP.ROCKLAND, MA$8,000
ASHLAND WATER GROUP INC.RISINGSUN, OH$6,951

Free toolbox talk

A 5-minute crew talk on 1910.217(e)(1)(i), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1910.217(e)(1)(i).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

What parts must be checked on a power press?

All parts, auxiliary equipment and safeguards, including the clutch/brake mechanism, antirepeat feature and single-stroke mechanism.

Can a press be run before repairs are done?

No. Necessary maintenance or repair must be completed before operating the press.

What goes on the certification record?

The date, the signature of the person who did the work, and the serial number or other identifier of the press.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Scroll to top