29 CFR 1910 · General Industry · Subpart Q

1910.254(d)(9)(iii): Replacing Damaged Welding Cables

By Black Belt Safety Editorial Team Official text as of October 15, 2026 Data updated November 17, 2026 3 min read

In plain words:

Employers must replace welding cables that have damaged insulation or exposed bare conductors. Work and electrode cable lengths may be joined only with connecting means made for that purpose, with insulation adequate for the service conditions.

Key takeaways

  • 1910.254(d)(9)(iii) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart Q).
  • OSHA cited it 80 times in the last 3 years, in 80 inspections, with $251,903 in current penalties.
  • Most citations: NY (10), TN (7), VA (6).
  • Related part: 1910.254(d) Operation and maintenance (96 citations).
  • Free 5-minute toolbox talk for your crew below.

Get the free 5-minute toolbox talk on 1910.254(d)(9)(iii) ↓

80citations, 3 years
$251,903current penalties
80inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1910.254(d)(9)(iii) is one requirement inside 1910.254 Arc welding and cutting, an OSHA general industry standard (Part 1910, Subpart Q). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(iii) Cables with damaged insulation or exposed bare conductors shall be replaced. Joining lengths of work and electrode cables shall be done by the use of connecting means specifically intended for the purpose. The connecting means shall have insulation adequate for the service conditions. 80 citations

[55 FR 13696, Apr. 11, 1990, as amended at 61 FR 9241, Mar. 7, 1996; 70 FR 53929, Sept. 13, 2005]

Source: eCFR, text current as of 2026-10-15. Read all of 1910.254.

See every company cited for this rule.

Export the list: 80 inspections cited 1910.254(d)(9)(iii) in the last 3 years, with employer, location, penalty and date.

Purple Belt, $59/mo

Where and how often it was cited

YearCitations
20233
202435
202528
202614

Top states: NY (10), TN (7), VA (6), MN (6), TX (5)

Largest penalties

EmployerLocationPenalty for this rule
VTCU, CORP.POCATELLO, ID$70,938
ZACHRY MAINTENANCE SERVICES, LLCMANSFIELD, LA$16,131
LIEBHERR AMERICANEWPORT NEWS, VA$13,840
POLARIS, INC.MADISON, AL$12,905
WEG TRANSFORMERS USA LLCWASHINGTON, MO$9,930

Free toolbox talk

A 5-minute crew talk on 1910.254(d)(9)(iii), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1910.254(d)(9)(iii).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

What must happen to a welding cable with damaged insulation?

It must be replaced.

Can I splice welding cables with tape?

Lengths must be joined only with connecting means specifically intended for the purpose.

How well insulated must the connectors be?

The connecting means must have insulation adequate for the service conditions.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Scroll to top