29 CFR 1910 · General Industry · Subpart R

1910.269(d)(5): Notify Workers About Lockout and Tagout

By Black Belt Safety Editorial Team Official text as of October 15, 2026 Data updated November 6, 2026 3 min read

In plain words:

Employers or authorized employees must notify affected employees when lockout or tagout devices are applied and removed. Notice must be given before the controls are applied and after they are removed, and a second notice must come before the machine or equipment is reenergized.

Key takeaways

  • 1910.269(d)(5) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart R).
  • OSHA cited it 1 times in the last 3 years, in 1 inspections, with $6,300 in current penalties.
  • 1 death is linked to inspections that cited this rule.
  • Related part: 1910.269(d) Hazardous energy control (lockout/tagout) procedures (47 citations).
  • Free 5-minute toolbox talk for your crew below.

Get the free 5-minute toolbox talk on 1910.269(d)(5) ↓

1citations, 3 years
$6,300current penalties
1inspections
1linked deaths
In this article
  1. What this rule covers
  2. Official text
  3. Injuries linked to this rule
  4. Where and how often it was cited
  5. Free toolbox talk
  6. OSHA interpretation letters
  7. Related parts of this rule
  8. Get your crew competent
  9. Frequently asked questions
  10. About this page

What this rule covers

29 CFR 1910.269(d)(5) ("Notification") is one requirement inside 1910.269 Electric power generation, transmission, and distribution, an OSHA general industry standard (Part 1910, Subpart R). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(5) Notification. Affected employees shall be notified by the employer or authorized employee of the application and removal of lockout or tagout devices. Notification shall be given before the controls are applied and after they are removed from the machine or equipment. 1 citations

See also paragraph (d)(7) of this section, which requires that the second notification take place before the machine or equipment is reenergized.

Source: eCFR, text current as of 2026-10-15. Read all of 1910.269.

See every company cited for this rule.

Export the list: 1 inspections cited 1910.269(d)(5) in the last 3 years, with employer, location, penalty and date.

Purple Belt, $59/mo

Injuries linked to this rule

1 death is linked to inspections where OSHA cited 1910.269(d)(5).

Employee replacing water damaged wire dies when electrocuted
2024-07-31 · Fatal · MURRAY, KY

On July 31, 2024, an employee working for an electrical contractor was shocked while replacing flood-damaged electrical cable. The employee died due to electrocution.

Where and how often it was cited

Free toolbox talk

A 5-minute crew talk on 1910.269(d)(5), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1910.269(d)(5).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

Who must be notified about lockout or tagout?

Affected employees.

When must notification be given?

Before the controls are applied and after they are removed from the machine or equipment.

Is there a notice before reenergizing?

Yes, paragraph (d)(7) requires the second notification before the machine or equipment is reenergized.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Scroll to top