29 CFR 1926 · Construction · Subpart Z

1926.1101(j)(1): Decontamination for Large Class I Asbestos Jobs

By Black Belt Safety Editorial Team Official text as of October 15, 2026 Data updated October 23, 2026 5 min read

In plain words:

For Class I asbestos jobs involving over 25 linear or 10 square feet of TSI or surfacing ACM and PACM, employers must set up a decontamination area next to and connected to the regulated area, with an equipment room, shower area and clean room in series. Employees must enter and exit through it.

Key takeaways

  • 1926.1101(j)(1) is part of OSHA's construction standards (29 CFR Part 1926, Subpart Z).
  • OSHA cited it 60 times in the last 3 years, in 46 inspections, with $54,028 in current penalties.
  • Most citations: MI (45), NV (3), VA (3).
  • Related part: 1926.1101(j) Hygiene facilities and practices for employees (116 citations).
  • Free 5-minute toolbox talk for your crew below.
60citations, 3 years
$54,028current penalties
46inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1926.1101(j)(1) is one requirement inside 1926.1101 Asbestos, an OSHA construction standard (Part 1926, Subpart Z). It includes 16 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(1) Requirements for employees performing Class I asbestos jobs involving over 25 linear or 10 square feet of TSI or surfacing ACM and PACM. 60 citations

(i) Decontamination areas. The employer shall establish a decontamination area that is adjacent and connected to the regulated area for the decontamination of such employees. The decontamination area shall consist of an equipment room, shower area, and clean room in series. The employer shall ensure that employees enter and exit the regulated area through the decontamination area. Open (j)(1)(i) 33 citations

(A) Equipment room. The equipment room shall be supplied with impermeable, labeled bags and containers for the containment and disposal of contaminated protective equipment.

(B) Shower area. Shower facilities shall be provided which comply with 29 CFR 1910.141(d)(3), unless the employer can demonstrate that they are not feasible. The showers shall be adjacent both to the equipment room and the clean room, unless the employer can demonstrate that this location is not feasible. Where the employer can demonstrate that it is not feasible to locate the shower between the equipment room and the clean room, or where the work is performed outdoors, the employers shall ensure that employees: Open (j)(1)(i)(b) 8 citations

(1) Remove asbestos contamination from their worksuits in the equipment room using a HEPA vacuum before proceeding to a shower that is not adjacent to the work area; or

(2) Remove their contaminated worksuits in the equipment room, then don clean worksuits, and proceed to a shower that is not adjacent to the work area.

(C) Clean change room. The clean room shall be equipped with a locker or appropriate storage container for each employee's use. When the employer can demonstrate that it is not feasible to provide a clean change area adjacent to the work area or where the work is performed outdoors, the employer may permit employees engaged in Class I asbestos jobs to clean their protective clothing with a portable HEPA-equipped vacuum before such employees leave the regulated area. Following showering, such employees however must then change into street clothing in clean change areas provided by the employer which otherwise meet the requirements of this section.

(ii) Decontamination area entry procedures. The employer shall ensure that employees: Open (j)(1)(ii) 12 citations

(A) Enter the decontamination area through the clean room;

(B) Remove and deposit street clothing within a locker provided for their use; and 1 citations

(C) Put on protective clothing and respiratory protection before leaving the clean room. 1 citations

(D) Before entering the regulated area, the employer shall ensure that employees pass through the equipment room.

(iii) Decontamination area exit procedures. The employer shall ensure that: Open (j)(1)(iii) 13 citations

(A) Before leaving the regulated area, employees shall remove all gross contamination and debris from their protective clothing.

(B) Employees shall remove their protective clothing in the equipment room and deposit the clothing in labeled impermeable bags or containers.

(C) Employees shall not remove their respirators in the equipment room.

(D) Employees shall shower prior to entering the clean room. 1 citations

(E) After showering, employees shall enter the clean room before changing into street clothes.

(iv) Lunch Areas. Whenever food or beverages are consumed at the worksite where employees are performing Class I asbestos work, the employer shall provide lunch areas in which the airborne concentrations of asbestos are below the permissible exposure limit and/or excursion limit. 1 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1926.1101.

Where and how often it was cited

YearCitations
20232
202420
202520
202618

Top states: MI (45), NV (3), VA (3), TN (2), MO (2)

Largest penalties

EmployerLocationPenalty for this rule
GGG DEMOLITION, INC.LAS VEGAS, NV$11,292
TROY BOILER WORKS, INC.GERMANTOWN, NY$7,904
SEMCO SERVICES, INC.WAYNESBORO, VA$7,570
MIDWEST ENVIRONMENTAL, INC.ROMULUS, MI$6,000
MWV ENVIRONMENTAL SERVICES, INC.DETROIT, MI$5,040

Free toolbox talk

A 5-minute crew talk on 1926.1101(j)(1), plus alerts when this rule changes. Free.




OSHA interpretation letters

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

When is a decontamination area required?

For Class I jobs involving over 25 linear or 10 square feet of TSI or surfacing ACM and PACM.

What rooms make up the decontamination area?

An equipment room, shower area and clean room in series.

What if a shower cannot be located between rooms?

Workers must HEPA vacuum their worksuits or change into clean worksuits in the equipment room before going to a shower not adjacent to the work area.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Scroll to top