1926.1410: Crane Work Closer Than Table A Zone
Crane operations where any part of the equipment, load line or load gets closer than the Table A minimum approach distance to an energized power line are prohibited unless the employer shows all listed requirements are met. These include showing the work cannot be done without breaching the distance, showing it is infeasible to deenergize and ground or relocate the line after consulting the utility, having a qualified person set a minimum clearance distance, and holding a planning meeting.
Key takeaways
- 1926.1410 is part of OSHA's construction standards (29 CFR Part 1926, Subpart CC).
- OSHA cited it 5 times in the last 3 years, in 2 inspections, with $18,550 in current penalties.
- Free 5-minute toolbox talk for your crew below.
Get the free 5-minute toolbox talk on 1926.1410 ↓
In this article
What this rule covers
29 CFR 1926.1410, "Power line safety (all voltages)—equipment operations closer than the Table A zone", is an OSHA construction standard (Part 1926, Subpart CC). It has 38 numbered paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.
Official text
Show the full text of 1926.1410 (38 paragraphs)
Equipment operations in which any part of the equipment, load line, or load (including rigging and lifting accessories) is closer than the minimum approach distance under Table A of § 1926.1408 to an energized power line is prohibited, except where the employer demonstrates that all of the following requirements are met:
(a) The employer determines that it is infeasible to do the work without breaching the minimum approach distance under Table A of § 1926.1408.
(b) The employer determines that, after consultation with the utility owner/operator, it is infeasible to deenergize and ground the power line or relocate the power line.
(c) Minimum clearance distance.
(1) The power line owner/operator or registered professional engineer who is a qualified person with respect to electrical power transmission and distribution determines the minimum clearance distance that must be maintained to prevent electrical contact in light of the on-site conditions. The factors that must be considered in making this determination include, but are not limited to: Conditions affecting atmospheric conductivity; time necessary to bring the equipment, load line, and load (including rigging and lifting accessories) to a complete stop; wind conditions; degree of sway in the power line; lighting conditions, and other conditions affecting the ability to prevent electrical contact.
(2) Paragraph (c)(1) of this section does not apply to work covered by subpart V of this part; instead, for such work, the minimum approach distances established by the employer under § 1926.960(c)(1)(i) apply.
(d) A planning meeting with the employer and utility owner/operator (or registered professional engineer who is a qualified person with respect to electrical power transmission and distribution) is held to determine the procedures that will be followed to prevent electrical contact and electrocution. At a minimum these procedures must include: 5 citations
(1) If the power line is equipped with a device that automatically reenergizes the circuit in the event of a power line contact, before the work begins, the automatic reclosing feature of the circuit interrupting device must be made inoperative if the design of the device permits.
(2) A dedicated spotter who is in continuous contact with the operator. The dedicated spotter must: 1 citations
(i) Be equipped with a visual aid to assist in identifying the minimum clearance distance. Examples of a visual aid include, but are not limited to: A line painted on the ground; a clearly visible line of stanchions; a set of clearly visible line-of-sight landmarks (such as a fence post behind the dedicated spotter and a building corner ahead of the dedicated spotter).
(ii) Be positioned to effectively gauge the clearance distance.
(iii) Where necessary, use equipment that enables the dedicated spotter to communicate directly with the operator.
(iv) Give timely information to the operator so that the required clearance distance can be maintained.
(3) An elevated warning line, or barricade (not attached to the crane), in view of the operator (either directly or through video equipment), equipped with flags or similar high-visibility markings, to prevent electrical contact. However, this provision does not apply to work covered by subpart V of this part. 1 citations
(4) Insulating link/device. 1 citations
(i) An insulating link/device installed at a point between the end of the load line (or below) and the load. 1 citations
(ii) Paragraph (d)(4)(i) of this section does not apply to work covered by subpart V of this part.
(iii) [Reserved]
(iv) Until November 8, 2011, the following procedure may be substituted for the requirement in paragraph (d)(4)(i) of this section: All employees, excluding equipment operators located on the equipment, who may come in contact with the equipment, the load line, or the load must be insulated or guarded from the equipment, the load line, and the load. Insulating gloves rated for the voltage involved are adequate insulation for the purposes of this paragraph.
(v) Until November 8, 2013, the following procedure may be substituted for the requirement in (d)(4)(i) of this section:
(A) The employer must use a link/device manufactured on or before November 8, 2011, that meets the definition of an insulating link/device, except that it has not been approved by a Nationally Recognized Testing Laboratory, and that is maintained and used in accordance with manufacturer requirements and recommendations, and is installed at a point between the end of the load line (or below) and the load; and
(B) All employees, excluding equipment operators located on the equipment, who may come in contact with the equipment, the load line, or the load must be insulated or guarded from the equipment, the load line, and the load through an additional means other than the device described in paragraph (d)(4)(v)(A) of this section. Insulating gloves rated for the voltage involved are adequate additional means of protection for the purposes of this paragraph.
(5) Nonconductive rigging if the rigging may be within the Table A of § 1926.1408 distance during the operation.
(6) If the equipment is equipped with a device that automatically limits range of movement, it must be used and set to prevent any part of the equipment, load line, or load (including rigging and lifting accessories) from breaching the minimum approach distance established under paragraph (c) of this section.
(7) If a tag line is used, it must be of the nonconductive type.
(8) Barricades forming a perimeter at least 10 feet away from the equipment to prevent unauthorized personnel from entering the work area. In areas where obstacles prevent the barricade from being at least 10 feet away, the barricade must be as far from the equipment as feasible. 1 citations
(9) Workers other than the operator must be prohibited from touching the load line above the insulating link/device and crane. Operators remotely operating the equipment from the ground must use either wireless controls that isolate the operator from the equipment or insulating mats that insulate the operator from the ground.
(10) Only personnel essential to the operation are permitted to be in the area of the crane and load.
(11) The equipment must be properly grounded. 1 citations
(12) Insulating line hose or cover-up must be installed by the utility owner/operator except where such devices are unavailable for the line voltages involved.
(e) The procedures developed to comply with paragraph (d) of this section are documented and immediately available on-site.
(f) The equipment user and utility owner/operator (or registered professional engineer) meet with the equipment operator and the other workers who will be in the area of the equipment or load to review the procedures that will be implemented to prevent breaching the minimum approach distance established in paragraph (c) of this section and prevent electrocution.
(g) The procedures developed to comply with paragraph (d) of this section are implemented.
(h) The utility owner/operator (or registered professional engineer) and all employers of employees involved in the work must identify one person who will direct the implementation of the procedures. The person identified in accordance with this paragraph must direct the implementation of the procedures and must have the authority to stop work at any time to ensure safety.
(i) [Reserved]
(j) If a problem occurs implementing the procedures being used to comply with paragraph (d) of this section, or indicating that those procedures are inadequate to prevent electrocution, the employer must safely stop operations and either develop new procedures to comply with paragraph (d) of this section or have the utility owner/operator deenergize and visibly ground or relocate the power line before resuming work.
(k) Devices originally designed by the manufacturer for use as a safety device (see § 1926.1415), operational aid, or a means to prevent power line contact or electrocution, when used to comply with this section, must comply with the manufacturer's procedures for use and conditions of use.
(l) [Reserved]
(m) The employer must train each operator and crew member assigned to work with the equipment in accordance with § 1926.1408(g).
[75 FR 48135, Aug. 9, 2010, as amended at 79 FR 20743, Apr. 11, 2014]
Source: eCFR, text current as of 2026-10-15.
Export the list: 2 inspections cited 1926.1410 in the last 3 years, with employer, location, penalty and date.
Purple Belt, $59/moWhere and how often it was cited
Free toolbox talk
A 5-minute crew talk on 1926.1410, plus alerts when this rule changes. Free.
OSHA interpretation letters
None exist. OSHA has not published a letter of interpretation for 1926.1410.
Get your crew competent
Trainers on Black Belt Safety: Marc Harvey
Trainers and suppliers: feature your business on this rule for $25/month.
Frequently asked questions
Can a crane ever work closer than the Table A distance?
Only if the employer demonstrates all of the requirements in 1926.1410 are met.
Who sets the minimum clearance distance?
The power line owner/operator or a registered professional engineer who is a qualified person in electrical power transmission and distribution.
Must the utility be consulted?
Yes. The employer must determine, after consultation with the utility owner/operator, that deenergizing and grounding or relocating the line is infeasible.
About this page
Sources
- 29 CFR 1926.1410 (eCFR), text current as of 2026-10-15
- U.S. Department of Labor enforcement data: OSHA inspections, citations and accident records, copied nightly; data as of 2026-11-22
3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.
