In plain words:

A competent person must start a visual check of crane wire ropes before each shift the equipment is used and finish it before or during that shift. The check looks at running and standing ropes likely to be used that shift for clear defects, such as kinks, crushing, birdcaging, corrosion, heat or arc damage, broken wires and bad end connections.

Key takeaways

  • 1926.1413(a) is part of OSHA's construction standards (29 CFR Part 1926, Subpart CC).
  • OSHA cited it 13 times in the last 3 years, in 12 inspections, with $6,772 in current penalties.
  • 2 deaths are linked to inspections that cited this rule.
  • Most citations: RI (2), MD (2), TX (1).
  • Related part: 1926.1413(a)(1) (8 citations).
  • Free 5-minute toolbox talk for your crew below.
13citations, 3 years
$6,772current penalties
12inspections
2linked deaths
In this article
  1. What this rule covers
  2. Official text
  3. Injuries linked to this rule
  4. Where and how often it was cited
  5. Free toolbox talk
  6. OSHA interpretation letters
  7. Related parts of this rule
  8. Get your crew competent
  9. Frequently asked questions
  10. About this page

What this rule covers

29 CFR 1926.1413(a) ("Shift inspection") is one requirement inside 1926.1413 Wire rope—inspection, an OSHA construction standard (Part 1926, Subpart CC). It includes 33 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(a) Shift inspection. 13 citations

(1) A competent person must begin a visual inspection prior to each shift the equipment is used, which must be completed before or during that shift. The inspection must consist of observation of wire ropes (running and standing) that are likely to be in use during the shift for apparent deficiencies, including those listed in paragraph (a)(2) of this section. Untwisting (opening) of wire rope or booming down is not required as part of this inspection. Open (a)(1) 8 citations

(2) Apparent deficiencies — 4 citations

(i) Category I. Apparent deficiencies in this category include the following: 3 citations

(A) Significant distortion of the wire rope structure such as kinking, crushing, unstranding, birdcaging, signs of core failure or steel core protrusion between the outer strands. 2 citations

(B) Significant corrosion.

(C) Electric arc damage (from a source other than power lines) or heat damage.

(D) Improperly applied end connections.

(E) Significantly corroded, cracked, bent, or worn end connections (such as from severe service).

(ii) Category II. Apparent deficiencies in this category are:

(A) Visible broken wires, as follows:

(1) In running wire ropes: Six randomly distributed broken wires in one rope lay or three broken wires in one strand in one rope lay, where a rope lay is the length along the rope in which one strand makes a complete revolution around the rope.

(2) In rotation resistant ropes: Two randomly distributed broken wires in six rope diameters or four randomly distributed broken wires in 30 rope diameters.

(3) In pendants or standing wire ropes: More than two broken wires in one rope lay located in rope beyond end connections and/or more than one broken wire in a rope lay located at an end connection.

(B) A diameter reduction of more than 5% from nominal diameter.

(iii) Category III. Apparent deficiencies in this category include the following: 1 citations

(A) In rotation resistant wire rope, core protrusion or other distortion indicating core failure. 1 citations

(B) Prior electrical contact with a power line.

(C) A broken strand.

(3) Critical review items. The competent person must give particular attention to all of the following:

(i) Rotation resistant wire rope in use.

(ii) Wire rope being used for boom hoists and luffing hoists, particularly at reverse bends.

(iii) Wire rope at flange points, crossover points and repetitive pickup points on drums.

(iv) Wire rope at or near terminal ends.

(v) Wire rope in contact with saddles, equalizer sheaves or other sheaves where rope travel is limited.

(4) Removal from service. 1 citations

(i) If a deficiency in Category I (see paragraph (a)(2)(i) of this section) is identified, an immediate determination must be made by the competent person as to whether the deficiency constitutes a safety hazard. If the deficiency is determined to constitute a safety hazard, operations involving use of the wire rope in question must be prohibited until: 1 citations

(A) The wire rope is replaced (see § 1926.1417), or

(B) If the deficiency is localized, the problem is corrected by severing the wire rope in two; the undamaged portion may continue to be used. Joining lengths of wire rope by splicing is prohibited. If a rope is shortened under this paragraph, the employer must ensure that the drum will still have two wraps of wire when the load and/or boom is in its lowest position.

(ii) If a deficiency in Category II (see paragraph (a)(2)(ii) of this section) is identified, operations involving use of the wire rope in question must be prohibited until:

(A) The employer complies with the wire rope manufacturer's established criterion for removal from service or a different criterion that the wire rope manufacturer has approved in writing for that specific wire rope (see § 1926.1417),

(B) The wire rope is replaced (see § 1926.1417), or

(C) If the deficiency is localized, the problem is corrected by severing the wire rope in two; the undamaged portion may continue to be used. Joining lengths of wire rope by splicing is prohibited. If a rope is shortened under this paragraph, the employer must ensure that the drum will still have two wraps of wire when the load and/or boom is in its lowest position.

(iii) If a deficiency in Category III is identified, operations involving use of the wire rope in question must be prohibited until:

(A) The wire rope is replaced (see § 1926.1417), or

(B) If the deficiency (other than power line contact) is localized, the problem is corrected by severing the wire rope in two; the undamaged portion may continue to be used. Joining lengths of wire rope by splicing is prohibited. Repair of wire rope that contacted an energized power line is also prohibited. If a rope is shortened under this paragraph, the employer must ensure that the drum will still have two wraps of wire when the load and/or boom is in its lowest position.

(iv) Where a wire rope is required to be removed from service under this section, either the equipment (as a whole) or the hoist with that wire rope must be tagged-out, in accordance with § 1926.1417(f)(1), until the wire rope is repaired or replaced.

Source: eCFR, text current as of 2026-10-15. Read all of 1926.1413.

Injuries linked to this rule

2 deaths are linked to inspections where OSHA cited 1926.1413(a).

Employee is struck by falling lifting accessory and killed
2024-07-02 · Fatal · BRINSON, GA

At 10:39 a.m. on July 2, 2024, a custom-fabricated lifting accessory was being used to lift a new roof structure for a grain bin into place. Employees onsite were in the process of bolting the structure when the lifting accessory failed. Employee #1 was working…

See all 2 cases

Full case list with employer, penalty, filters and download is part of OSHA Data (Purple Belt).

Unlock with Purple Belt

Where and how often it was cited

YearCitations
20248
20253
20262

Top states: RI (2), MD (2), TX (1), DE (1), FL (1)

Largest penalties

EmployerLocationPenalty for this rule
BEELINE SERVICES, LLCCAMDEN WYOMING, DE$2,966
SUPERIOR SIGNSTAHLEQUAH, OK$1,986
PHOENIX RIGGING & ERECTING LLCFORT LAUDERDALE, FL$750
TIDAL ENTERPRISES, LLCWARREN, RI$500
RAYOS CRANE SERVICESEL PASO, TX$300

Free toolbox talk

A 5-minute crew talk on 1926.1413(a), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1926.1413(a).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

Who does the shift inspection of crane wire rope?

A competent person must do it.

When must the wire rope shift inspection happen?

It must begin before each shift the equipment is used and be completed before or during that shift.

Do you have to untwist the rope or boom down for this inspection?

No. Untwisting (opening) the wire rope or booming down is not required for the shift inspection.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Scroll to top