29 CFR 1926 · Construction · Subpart CC

1926.1417(b): When Operating Procedures Are Unavailable

By Black Belt Safety Editorial Team Official text as of October 15, 2026 Data updated October 19, 2026 3 min read

In plain words:

Where manufacturer procedures are unavailable, employers must develop and enforce all procedures needed for safe crane operation. Operational control procedures must be developed by a qualified person, and capacity procedures must be developed and signed by a registered professional engineer familiar with the equipment.

Key takeaways

  • 1926.1417(b) is part of OSHA's construction standards (29 CFR Part 1926, Subpart CC).
  • OSHA cited it 3 times in the last 3 years, in 3 inspections, with $25,976 in current penalties.
  • 1 death is linked to inspections that cited this rule.
  • Related part: 1926.1417(b)(1) (2 citations).
  • Free 5-minute toolbox talk for your crew below.
3citations, 3 years
$25,976current penalties
3inspections
1linked deaths
In this article
  1. What this rule covers
  2. Official text
  3. Injuries linked to this rule
  4. Where and how often it was cited
  5. Free toolbox talk
  6. OSHA interpretation letters
  7. Related parts of this rule
  8. Get your crew competent
  9. Frequently asked questions
  10. About this page

What this rule covers

29 CFR 1926.1417(b) ("Unavailable operation procedures") is one requirement inside 1926.1417 Operation, an OSHA construction standard (Part 1926, Subpart CC). It includes 3 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(b) Unavailable operation procedures. 3 citations

(1) Where the manufacturer procedures are unavailable, the employer must develop and ensure compliance with all procedures necessary for the safe operation of the equipment and attachments. Open (b)(1) 2 citations

(2) Procedures for the operational controls must be developed by a qualified person.

(3) Procedures related to the capacity of the equipment must be developed and signed by a registered professional engineer familiar with the equipment. 1 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1926.1417.

Injuries linked to this rule

1 death is linked to inspections where OSHA cited 1926.1417(b).

Employee is killed when pulling metal cable
2024-01-12 · Fatal · BALTIMORE, MD

At 7:50 a.m. on January 12, 2024, an employee was pulling metal cable. The cable drum engaged, pulling the employee onto the crane mast. The employee suffered a broken neck and was killed.

Where and how often it was cited

Free toolbox talk

A 5-minute crew talk on 1926.1417(b), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1926.1417(b).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

What if the manufacturer's procedures are missing?

The employer must develop and ensure compliance with all procedures needed for safe operation.

Who develops procedures for operational controls?

A qualified person.

Who develops capacity procedures?

A registered professional engineer familiar with the equipment, who must sign them.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Scroll to top