29 CFR 1926 · Construction · Subpart L

1926.451(b)(1): Fully Planked Scaffold Platforms

By Black Belt Safety Editorial Team Official text as of October 15, 2026 Data updated October 19, 2026 3 min read

In plain words:

Employers must make sure each scaffold working platform is fully planked or decked between the front uprights and guardrail supports, with gaps no more than 1 inch. Where a wider gap is shown to be needed, such as around uprights, the platform must be decked as fully as possible and the open space must not exceed 9 and one-half inches. Walkways and erector-only platforms have an exception.

Key takeaways

  • 1926.451(b)(1) is part of OSHA's construction standards (29 CFR Part 1926, Subpart L).
  • OSHA cited it 870 times in the last 3 years, in 853 inspections, with $3,234,483 in current penalties.
  • 8 deaths are linked to inspections that cited this rule.
  • Most citations: TX (97), FL (94), NY (65).
  • Related part: 1926.451(b) Scaffold platform construction (1,518 citations).
  • Free 5-minute toolbox talk for your crew below.
870citations, 3 years
$3,234,483current penalties
853inspections
8linked deaths
In this article
  1. What this rule covers
  2. Official text
  3. Injuries linked to this rule
  4. Where and how often it was cited
  5. Free toolbox talk
  6. OSHA interpretation letters
  7. Related parts of this rule
  8. Get your crew competent
  9. Frequently asked questions
  10. About this page

What this rule covers

29 CFR 1926.451(b)(1) is one requirement inside 1926.451 General requirements, an OSHA construction standard (Part 1926, Subpart L). It includes 2 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows: 870 citations

(i) Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) shall be installed so that the space between adjacent units and the space between the platform and the uprights is no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary (for example, to fit around uprights when side brackets are used to extend the width of the platform). Open (b)(1)(i) 168 citations

(ii) Where the employer makes the demonstration provided for in paragraph (b)(1)(i) of this section, the platform shall be planked or decked as fully as possible and the remaining open space between the platform and the uprights shall not exceed 91⁄2 inches (24.1 cm). Open (b)(1)(ii) 14 citations

Exception to paragraph (b)(1): The requirement in paragraph (b)(1) to provide full planking or decking does not apply to platforms used solely as walkways or solely by employees performing scaffold erection or dismantling. In these situations, only the planking that the employer establishes is necessary to provide safe working conditions is required.

Source: eCFR, text current as of 2026-10-15. Read all of 1926.451.

Injuries linked to this rule

8 deaths are linked to inspections where OSHA cited 1926.451(b)(1).

Employee falls from roof and sustains multiple injuries, lat
2024-12-17 · Fatal · LEHIGH ACRES, FL

On December 10, 2024, Employee #1 was working on a roof, applying tape between roof joints. While walking backward during the task, he slipped and fell approximately 12 feet to the ground. The employee sustained critical injuries from the impact of his back striking the…

See all 8 cases

Full case list with employer, penalty, filters and download is part of OSHA Data (Purple Belt).

Unlock with Purple Belt

Where and how often it was cited

YearCitations
202378
2024270
2025333
2026189

Top states: TX (97), FL (94), NY (65), VA (61), NJ (56)

Largest penalties

EmployerLocationPenalty for this rule
THOMAS BUILDERS OF VIRGINIA, INC.DALEVILLE, VA$307,480
JOSE CALLEPHILADELPHIA, PA$82,757
FINCANTIERI MARINE GROUP, LLCSTURGEON BAY, WI$59,115
JOSE CALLEHATBORO, PA$39,723
GTO CONSTRUCTION, INC.PHILADELPHIA, PA$25,781

Free toolbox talk

A 5-minute crew talk on 1926.451(b)(1), plus alerts when this rule changes. Free.




OSHA interpretation letters

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

How big can gaps between scaffold planks be?

No more than 1 inch between adjacent units and between the platform and uprights, unless a wider space is shown to be necessary.

What is the largest gap allowed when a wider space is needed?

The remaining open space between the platform and the uprights must not exceed 9 and one-half inches.

Does full planking apply to walkways?

No. Platforms used solely as walkways or solely by workers erecting or dismantling the scaffold need only the planking the employer finds necessary for safe conditions.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Scroll to top