29 CFR 1926 · Construction · Subpart D

1926.52: Occupational Noise Exposure in Construction

By Black Belt Safety Editorial Team Official text as of October 15, 2026 Data updated October 19, 2026 3 min read

In plain words:

Employers must protect construction workers from noise above the levels in Table D-2. They must first use feasible administrative or engineering controls, then provide hearing protection if controls do not bring levels within the table, and run a continuing, effective hearing conservation program whenever sound levels exceed the values shown.

Key takeaways

  • 1926.52 is part of OSHA's construction standards (29 CFR Part 1926, Subpart D).
  • OSHA cited it 11 times in the last 3 years, in 11 inspections, with $47,105 in current penalties.
  • Most citations: AL (2), NC (1), NJ (1).
  • Most-cited part: 1926.52(e).
  • Free 5-minute toolbox talk for your crew below.
11citations, 3 years
$47,105current penalties
11inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Most-cited parts of this rule
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1926.52, "Occupational noise exposure", is an OSHA construction standard (Part 1926, Subpart D). It has 10 numbered paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

Show the full text of 1926.52 (10 paragraphs)

(a) Protection against the effects of noise exposure shall be provided when the sound levels exceed those shown in Table D-2 of this section when measured on the A-scale of a standard sound level meter at slow response.

(b) When employees are subjected to sound levels exceeding those listed in Table D-2 of this section, feasible administrative or engineering controls shall be utilized. If such controls fail to reduce sound levels within the levels of the table, personal protective equipment as required in subpart E, shall be provided and used to reduce sound levels within the levels of the table. 2 citations

(c) If the variations in noise level involve maxima at intervals of 1 second or less, it is to be considered continuous.

(d) 9 citations

(1) In all cases where the sound levels exceed the values shown herein, a continuing, effective hearing conservation program shall be administered. 9 citations

Table D-2—Permissible Noise Exposures

Duration per day, hours Sound level dBA slow response
8 90
6 92
4 95
3 97
2 100
11⁄2 102
1 105
1⁄2 110
1⁄4 or less 115

(2)

(i) When the daily noise exposure is composed of two or more periods of noise exposure of different levels, their combined effect should be considered, rather than the individual effect of each. Exposure to different levels for various periods of time shall be computed according to the formula set forth in paragraph (d)(2)(ii) of this section.

(ii) Fe = (T1/L1) + (T2/L2) + · · · + (Tn/Ln)

Where:

Fe = The equivalent noise exposure factor.

T = The period of noise exposure at any essentially constant level.

L = The duration of the permissible noise exposure at the constant level (from Table D-2).

If the value of Fe exceeds unity (1) the exposure exceeds permissible levels.

(iii) A sample computation showing an application of the formula in paragraph (d)(2)(ii) of this section is as follows. An employee is exposed at these levels for these periods:

110 db A 1⁄4 hour.

100 db A 1⁄2 hour.

90 db A 11⁄2 hours.

Fe = (1⁄4/ 1⁄2) + (1⁄2/2) + (11⁄2/8)

Fe = 0.500 + 0.25 + 0.188

Fe = 0.938

Since the value of Fe does not exceed unity, the exposure is within permissible limits.

(e) Exposure to impulsive or impact noise should not exceed 140 dB peak sound pressure level. Open (e)

Source: eCFR, text current as of 2026-10-15.

Where and how often it was cited

YearCitations
20244
20254
20263

Top states: AL (2), NC (1), NJ (1), KS (1), OK (1)

Largest penalties

EmployerLocationPenalty for this rule
TWI RECONSTRUCTION/ TOM WHITE, INC.REDINGTON SHORES, FL$9,268
US TANK PAINTING, INC.BAYVILLE, NJ$8,750
M. D. THOMAS CONSTRUCTION, LLCORANGE BEACH, AL$5,296
155647 - CLEAR SITE INDUSTRIAL, LLCCONCORD, NC$5,100
PERFORMANCE PERSONNEL SERVICES OF PENSACOLA, LLCMOBILE, AL$4,766

Free toolbox talk

A 5-minute crew talk on 1926.52, plus alerts when this rule changes. Free.




OSHA interpretation letters

Most-cited parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

What is the 8-hour noise limit in construction?

Table D-2 lists 90 dBA slow response for 8 hours per day.

What must be tried before hearing protection?

Feasible administrative or engineering controls.

How are different noise levels combined?

Using the formula Fe = (T1/L1) + (T2/L2) + ... ; if Fe exceeds 1, the exposure exceeds permissible levels.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Scroll to top