29 CFR 1926 · Construction · Subpart Q

1926.703(a)(1): Formwork Must Support All Loads

By Black Belt Safety Editorial Team Official text as of October 15, 2026 Data updated October 19, 2026 3 min read

In plain words:

Formwork must be designed, built, erected, supported, braced and maintained so it can support, without failure, all vertical and lateral loads that may reasonably be expected. Formwork that meets the appendix to this section is deemed to meet this requirement.

Key takeaways

  • 1926.703(a)(1) is part of OSHA's construction standards (29 CFR Part 1926, Subpart Q).
  • OSHA cited it 20 times in the last 3 years, in 20 inspections, with $227,307 in current penalties.
  • Most citations: FL (7), TX (2), NY (2).
  • Related part: 1926.703(a) General requirements for formwork (22 citations).
  • Free 5-minute toolbox talk for your crew below.
20citations, 3 years
$227,307current penalties
20inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1926.703(a)(1) is one requirement inside 1926.703 Requirements for cast-in-place concrete, an OSHA construction standard (Part 1926, Subpart Q). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(1) Formwork shall be designed, fabricated, erected, supported, braced and maintained so that it will be capable of supporting without failure all vertical and lateral loads that may reasonably be anticipated to be applied to the formwork. Formwork which is designed, fabricated, erected, supported, braced and maintained in conformance with the appendix to this section will be deemed to meet the requirements of this paragraph. 20 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1926.703.

Where and how often it was cited

YearCitations
20231
20248
20253
20268

Top states: FL (7), TX (2), NY (2), CT (1), VA (1)

Largest penalties

EmployerLocationPenalty for this rule
SEVEN CONCRETE, LLCNEW HAVEN, CT$60,000
LITHKO CONTRACTING, LLCOKLAHOMA CITY, OK$16,550
SOUTHLAND CONTRACTING INC.DALLAS, TX$16,550
KMI, INC.BROOKLYN, NY$16,550
ARCHER WESTERN - DE MOYA JOINT VENTUREMIAMI, FL$16,550

Free toolbox talk

A 5-minute crew talk on 1926.703(a)(1), plus alerts when this rule changes. Free.




OSHA interpretation letters

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

What loads must formwork carry?

All vertical and lateral loads that may reasonably be anticipated to be applied to the formwork.

Does this only cover design?

No. It covers design, fabrication, erection, support, bracing and maintenance.

Is there a way to show compliance?

Formwork built and maintained in conformance with the appendix to this section is deemed to meet the rule.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Scroll to top