29 CFR 1926 · Construction · Subpart S

1926.800(t)(1): General requirements for cranes and hoists

By Black Belt Safety Editorial Team Official text as of October 15, 2026 4 min read

Key takeaways

  • 1926.800(t)(1) is part of OSHA's construction standards (29 CFR Part 1926, Subpart S).
  • Related part: 1926.800(t)(1)(vii).
  • Free 5-minute toolbox talk for your crew below.

Get the free 5-minute toolbox talk on 1926.800(t)(1) ↓

In this article
  1. What this rule covers
  2. Official text
  3. Free toolbox talk
  4. OSHA interpretation letters
  5. Related parts of this rule
  6. Get your crew competent
  7. About this page

What this rule covers

29 CFR 1926.800(t)(1) ("General requirements for cranes and hoists") is one requirement inside 1926.800 Underground construction, an OSHA construction standard (Part 1926, Subpart S). It includes 10 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(1) General requirements for cranes and hoists.

(i) Materials, tools, and supplies being raised or lowered, whether within a cage or otherwise, shall be secured or stacked in a manner to prevent the load from shifting, snagging or falling into the shaft.

(ii) A warning light suitably located to warn employees at the shaft bottom and subsurface shaft entrances shall flash whenever a load is above the shaft bottom or subsurface entrances, or the load is being moved in the shaft. This paragraph does not apply to fully enclosed hoistways.

(iii) Whenever a hoistway is not fully enclosed and employees are at the shaft bottom, conveyances or equipment shall be stopped at least 15 feet (4.57 m) above the bottom of the shaft and held there until the signalman at the bottom of the shaft directs the operator to continue lowering the load, except that the load may be lowered without stopping if the load or conveyance is within full view of a bottom signalman who is in constant voice communication with the operator.

(iv)

(A) Before maintenance, repairs, or other work is commenced in the shaft served by a cage, skip, or bucket, the operator and other employees in the area shall be informed and given suitable instructions.

(B) A sign warning that work is being done in the shaft shall be installed at the shaft collar, at the operator's station, and at each underground landing.

(v) Any connection between the hoisting rope and the cage or skip shall be compatible with the type of wire rope used for hoisting.

(vi) Spin-type connections, where used, shall be maintained in a clean condition and protected from foreign matter that could affect their operation.

(vii) Cage, skip, and load connections to the hoist rope shall be made so that the force of the hoist pull, vibration, misalignment, release of lift force, or impact will not disengage the connection. Moused or latched openthroat hooks do not meet this requirement. Open (t)(1)(vii)

(viii) When using wire rope wedge sockets, means shall be provided to prevent wedge escapement and to ensure that the wedge is properly seated.

Source: eCFR, text current as of 2026-10-15. Read all of 1926.800.

Free toolbox talk

A 5-minute crew talk on 1926.800(t)(1), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1926.800(t)(1).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey

Trainers and suppliers: feature your business on this rule for $25/month.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Scroll to top