29 CFR 1926 · Construction · Subpart V

1926.960(c)(1)(ii): OSHA rule

By Black Belt Safety Editorial Team Official text as of October 15, 2026 Data updated October 20, 2026 3 min read

Key takeaways

  • 1926.960(c)(1)(ii) is part of OSHA's construction standards (29 CFR Part 1926, Subpart V).
  • OSHA cited it 2 times in the last 3 years, in 2 inspections, with $23,170 in current penalties.
  • Related part: 1926.960(c) Live work (34 citations).
  • Free 5-minute toolbox talk for your crew below.
2citations, 3 years
$23,170current penalties
2inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. About this page

What this rule covers

29 CFR 1926.960(c)(1)(ii) is one requirement inside 1926.960 Working on or near exposed energized parts, an OSHA construction standard (Part 1926, Subpart V). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(ii) No later than April 1, 2015, for voltages over 72.5 kilovolts, the employer shall determine the maximum anticipated per-unit transient overvoltage, phase-to-ground, through an engineering analysis or assume a maximum anticipated per-unit transient overvoltage, phase-to-ground, in accordance with Table V-8. When the employer uses portable protective gaps to control the maximum transient overvoltage, the value of the maximum anticipated per-unit transient overvoltage, phase-to-ground, must provide for five standard deviations between the statistical sparkover voltage of the gap and the statistical withstand voltage corresponding to the electrical component of the minimum approach distance. The employer shall make any engineering analysis conducted to determine maximum anticipated per-unit transient overvoltage available upon request to employees and to the Assistant Secretary or designee for examination and copying. 2 citations

See appendix B to this subpart for information on how to calculate the maximum anticipated per-unit transient overvoltage, phase-to-ground, when the employer uses portable protective gaps to reduce maximum transient overvoltages.

Source: eCFR, text current as of 2026-10-15. Read all of 1926.960.

Where and how often it was cited

Free toolbox talk

A 5-minute crew talk on 1926.960(c)(1)(ii), plus alerts when this rule changes. Free.




OSHA interpretation letters

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.