29 CFR 1910 · General Industry · Subpart H

1910.107(b)(1): Spray Booth Construction

By Black Belt Safety Editorial Team Official text as of octubre 15, 2026 Data updated octubre 20, 2026 3 min read

In plain words:

Spray booths must be substantially built of steel, securely and rigidly supported, or of concrete or masonry. Aluminum or other substantial noncombustible material may be used for intermittent or low volume spraying. Booths must be designed to sweep air currents toward the exhaust outlet.

Key takeaways

  • 1910.107(b)(1) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart H).
  • OSHA cited it 39 times in the last 3 years, in 39 inspections, with $67,442 in current penalties.
  • Most citations: MN (4), MI (4), VA (3).
  • Related part: 1910.107(b) Spray booths (559 citations).
  • Free 5-minute toolbox talk for your crew below.
39citations, 3 years
$67,442current penalties
39inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1910.107(b)(1) ("Construction") is one requirement inside 1910.107 Spray finishing using flammable and combustible materials, an OSHA general industry standard (Part 1910, Subpart H). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(1) Construction. Spray booths shall be substantially constructed of steel, securely and rigidly supported, or of concrete or masonry except that aluminum or other substantial noncombustible material may be used for intermittent or low volume spraying. Spray booths shall be designed to sweep air currents toward the exhaust outlet. 39 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1910.107.

Where and how often it was cited

YearCitations
20232
202413
202516
20268

Top states: MN (4), MI (4), VA (3), FL (2), TN (2)

Largest penalties

EmployerLocationPenalty for this rule
HO-HO-KUS INC.RICHMOND, VA$5,850
VAN-AM PAINT AND FABRICATIONSAINT JOSEPH, MO$5,561
AL-CO PRODUCTS, INCLATTY, OH$4,610
PINNACLE X-RAY SOLUTIONS, LLCDULUTH, GA$3,972
KENNETH DUGENSKEWAUPACA, WI$3,226

Free toolbox talk

A 5-minute crew talk on 1910.107(b)(1), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1910.107(b)(1).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

What materials can a spray booth be built from?

Steel securely and rigidly supported, or concrete or masonry.

When is aluminum allowed?

Aluminum or other substantial noncombustible material may be used for intermittent or low volume spraying.

How must air move in the booth?

The booth must be designed to sweep air currents toward the exhaust outlet.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Desplácese hacia arriba