29 CFR 1910 · General Industry · Subpart H

1910.107(b)(9): Spray Booth Cleaning Access and Clear Space

By Black Belt Safety Editorial Team Official text as of octubre 15, 2026 Data updated octubre 20, 2026 3 min read

In plain words:

Employers must install spray booths so all parts are readily accessible for cleaning. A clear space of not less than 3 feet on all sides must be kept free from storage or combustible construction.

Key takeaways

  • 1910.107(b)(9) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart H).
  • OSHA cited it 204 times in the last 3 years, in 204 inspections, with $234,876 in current penalties.
  • Most citations: MN (46), VA (15), MD (14).
  • Related part: 1910.107(b) Spray booths (559 citations).
  • Free 5-minute toolbox talk for your crew below.
204citations, 3 years
$234,876current penalties
204inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1910.107(b)(9) ("Cleaning") is one requirement inside 1910.107 Spray finishing using flammable and combustible materials, an OSHA general industry standard (Part 1910, Subpart H). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(9) Cleaning. Spray booths shall be so installed that all portions are readily accessible for cleaning. A clear space of not less than 3 feet on all sides shall be kept free from storage or combustible construction. 204 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1910.107.

Where and how often it was cited

YearCitations
20239
202457
202576
202662

Top states: MN (46), VA (15), MD (14), TN (13), NC (12)

Largest penalties

EmployerLocationPenalty for this rule
CRASH CHAMPIONS, LLCALLENTOWN, PA$17,733
LMI FINISHING, INC.CATOOSA, OK$11,524
GENEVA RECONDITIONING SERVICES, LLCALEXANDRIA, VA$7,425
HOLLAND, L.P.UNIVERSITY PARK, IL$6,500
ABLE COMPOSITES LLCJOPLIN, MO$6,385

Free toolbox talk

A 5-minute crew talk on 1910.107(b)(9), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1910.107(b)(9).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

How much clear space is needed around a spray booth?

Not less than 3 feet on all sides.

What must be kept out of that space?

Storage and combustible construction.

Why must all parts be accessible?

So all portions of the booth are readily accessible for cleaning.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Desplácese hacia arriba