1910.147(f)(1)(v): Re-Lock Before Continuing Service After Testing

By Black Belt Safety Editorial Team Official text as of octubre 15, 2026 Data updated octubre 20, 2026 3 min read

In plain words:

After equipment is temporarily re-energized for testing or positioning, employers must deenergize all systems and reapply energy control measures under paragraph (d) to continue the servicing and/or maintenance.

Key takeaways

  • 1910.147(f)(1)(v) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart J).
  • OSHA cited it 14 times in the last 3 years, in 14 inspections, with $131,487 in current penalties.
  • Most citations: KS (5), WI (3), IN (1).
  • Related part: 1910.147(f) Additional requirements (493 citations).
  • Free 5-minute toolbox talk for your crew below.
14citations, 3 years
$131,487current penalties
14inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1910.147(f)(1)(v) is one requirement inside 1910.147 The control of hazardous energy (lockout/tagout), an OSHA general industry standard (Part 1910, Subpart J). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(v) Deenergize all systems and reapply energy control measures in accordance with paragraph (d) of this section to continue the servicing and/or maintenance. 14 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1910.147.

Where and how often it was cited

YearCitations
20245
20254
20265

Top states: KS (5), WI (3), IN (1), NC (1), PA (1)

Largest penalties

EmployerLocationPenalty for this rule
GOODMAN MANUFACTURING COMPANY, L.P.WALLER, TX$16,550
WALMART, INC.OTTAWA, KS$16,131
SIMAKAS COMPANY, INC.PROCTOR, WV$12,500
155820 - BHARAT FORGE ALUMINUM USA, INCSANFORD, NC$12,000
GRAIN CRAFT, LLCKANSAS CITY, KS$11,823

Free toolbox talk

A 5-minute crew talk on 1910.147(f)(1)(v), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1910.147(f)(1)(v).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

What happens after testing a machine during lockout?

All systems must be deenergized and energy control measures reapplied before service continues.

Which procedure is followed?

The application of control steps in paragraph (d) of 1910.147.

Can work continue right after a test run?

Not until energy control is reapplied.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Desplácese hacia arriba