29 CFR 1910 · General Industry · Subpart J

1910.147(f)(1): Testing or Positioning During Lockout

By Black Belt Safety Editorial Team Official text as of octubre 15, 2026 Data updated octubre 20, 2026 3 min read

In plain words:

When lockout or tagout devices must be temporarily removed so a machine can be energized for testing or positioning, employers must follow a set sequence. Clear tools and materials, remove employees from the area, remove the devices, energize and test, then de-energize and reapply energy control before continuing service.

Key takeaways

  • 1910.147(f)(1) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart J).
  • OSHA cited it 140 times in the last 3 years, in 138 inspections, with $919,588 in current penalties.
  • 1 death is linked to inspections that cited this rule.
  • Most citations: OH (23), WI (19), MI (13).
  • Related part: 1910.147(f) Additional requirements (493 citations).
  • Free 5-minute toolbox talk for your crew below.
140citations, 3 years
$919,588current penalties
138inspections
1linked deaths
In this article
  1. What this rule covers
  2. Official text
  3. Injuries linked to this rule
  4. Where and how often it was cited
  5. Free toolbox talk
  6. OSHA interpretation letters
  7. Related parts of this rule
  8. Get your crew competent
  9. Frequently asked questions
  10. About this page

What this rule covers

29 CFR 1910.147(f)(1) ("Testing or positioning of machines, equipment or components thereof") is one requirement inside 1910.147 The control of hazardous energy (lockout/tagout), an OSHA general industry standard (Part 1910, Subpart J). It includes 5 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(1) Testing or positioning of machines, equipment or components thereof. In situations in which lockout or tagout devices must be temporarily removed from the energy isolating device and the machine or equipment energized to test or position the machine, equipment or component thereof, the following sequence of actions shall be followed: 140 citations

(i) Clear the machine or equipment of tools and materials in accordance with paragraph (e)(1) of this section; 2 citations

(ii) Remove employees from the machine or equipment area in accordance with paragraph (e)(2) of this section; Open (f)(1)(ii) 73 citations

(iii) Remove the lockout or tagout devices as specified in paragraph (e)(3) of this section;

(iv) Energize and proceed with testing or positioning;

(v) Deenergize all systems and reapply energy control measures in accordance with paragraph (d) of this section to continue the servicing and/or maintenance. Open (f)(1)(v) 14 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1910.147.

Injuries linked to this rule

1 death is linked to inspections where OSHA cited 1910.147(f)(1).

Employee is killed when crushed between tote dump and suppor
2024-10-08 · Fatal · LITTLE ROCK, AR

At 2:30 p.m. on October 8, 2024, Employee #1 and Coworker #1 were troubleshooting a malfunctioning tote dumper #2 at their workplace. While attempting repairs, Employee #1 stepped between the dumper and a steel column. At this point, tote dumper #2 began to operate in…

Where and how often it was cited

YearCitations
20234
202462
202538
202636

Top states: OH (23), WI (19), MI (13), IL (11), KS (7)

Largest penalties

EmployerLocationPenalty for this rule
MICHIGAN TURKEY PRODUCERSWYOMING, MI$17,500
CASE FARMS PROCESSING, INC.WINESBURG, OH$16,550
SAGE V FOODS, LLCLITTLE ROCK, AR$16,550
FUYAO GLASS AMERICAMORAINE, OH$16,550
GOODMAN MANUFACTURING COMPANY, L.P.WALLER, TX$16,550

Free toolbox talk

A 5-minute crew talk on 1910.147(f)(1), plus alerts when this rule changes. Free.




OSHA interpretation letters

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

Can locks be removed to test a machine during service?

Yes, temporarily, but only by following the required sequence in 1910.147(f)(1).

What is the first step before re-energizing to test?

Clear the machine or equipment of tools and materials.

What happens after testing is done?

De-energize all systems and reapply energy control measures before continuing servicing or maintenance.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Desplácese hacia arriba