1910.305(a)(2)(ii): Removing Temporary Wiring
Employers must remove temporary wiring immediately once the project or purpose it was installed for is finished.
Key takeaways
- 1910.305(a)(2)(ii) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart S).
- OSHA cited it 27 times in the last 3 years, in 27 inspections, with $32,020 in current penalties.
- Most citations: MI (4), AK (3), GA (3).
- Related part: 1910.305(a) Wiring methods (382 citations).
- Free 5-minute toolbox talk for your crew below.
In this article
What this rule covers
29 CFR 1910.305(a)(2)(ii) is one requirement inside 1910.305 Wiring methods, components, and equipment for general use, an OSHA general industry standard (Part 1910, Subpart S). The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.
Official text
(ii) Temporary wiring shall be removed immediately upon completion of the project or purpose for which the wiring was installed. 27 citations
Source: eCFR, text current as of 2026-10-15. Read all of 1910.305.
Where and how often it was cited
| Year | Citations |
|---|---|
| 2023 | 6 |
| 2024 | 9 |
| 2025 | 8 |
| 2026 | 4 |
Top states: MI (4), AK (3), GA (3), OR (2), NJ (2)
Largest penalties
| Employer | Location | Penalty for this rule |
|---|---|---|
| SUTTON TRANSPORT, INC. - ST. LOUIS | SAINT LOUIS, MO | $6,914 |
| MUNICIPALITY OF ANCHORAGE | ANCHORAGE, AK | $6,696 |
| CAMDEN CITY PUBLIC WORKS | CAMDEN, NJ | $6,300 |
| HATCH VALLEY VENTURES, LLC | GARFIELD, NM | $4,500 |
| CENTRO INCORPORATED | DAVENPORT, IA | $3,795 |
Free toolbox talk
A 5-minute crew talk on 1910.305(a)(2)(ii), plus alerts when this rule changes. Free.
OSHA interpretation letters
None exist. OSHA has not published a letter of interpretation for 1910.305(a)(2)(ii).
Related parts of this rule
- 1910.305(a) Wiring methods 382 citations
- 1910.305(a)(2) Temporary wiring 358 citations
- 1910.305(a)(2)(x) 123 citations
- 1910.305(a)(2)(ix) 100 citations
- 1910.305(a)(2)(i) 77 citations
- 1910.305(a)(1) General requirements 19 citations
- 1910.305(a)(1)(i) 19 citations
- 1910.305(a)(2)(xi) 11 citations
- 1910.305(a)(2)(i)(B) 10 citations
- 1910.305(a)(2)(v) 8 citations
- 1910.305(a)(2)(v)(C) 8 citations
- 1910.305(a)(3) Cable trays
Get your crew competent
Trainers on Black Belt Safety: Marc Harvey, Dana Reyes
Trainers and suppliers: feature your business on this rule for $25/month.
Frequently asked questions
When must temporary wiring be taken down?
Immediately upon completion of the project or purpose for which it was installed.
Can temporary wiring be left up for the next job?
No. The rule requires removal immediately once its project or purpose is complete.
Who is responsible?
The employer must make sure the temporary wiring is removed.
About this page
Sources
- 29 CFR 1910.305 (eCFR), text current as of 2026-10-15
- U.S. Department of Labor enforcement data: OSHA inspections, citations and accident records, copied nightly; data as of 2026-10-20
3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.
