1926.1101(g)(11): Alternative methods of compliance for installation, removal, repair, and maintenance of certain roofing and pipeline coating materials
Key takeaways
- 1926.1101(g)(11) is part of OSHA's construction standards (29 CFR Part 1926, Subpart Z).
- OSHA cited it 2 times in the last 3 years, in 2 inspections, with $6,700 in current penalties.
- Related part: 1926.1101(g) Methods of compliance (297 citations).
- Free 5-minute toolbox talk for your crew below.
In this article
What this rule covers
29 CFR 1926.1101(g)(11) ("Alternative methods of compliance for installation, removal, repair, and maintenance of certain roofing and pipeline coating materials") is one requirement inside 1926.1101 Asbestos, an OSHA construction standard (Part 1926, Subpart Z). It includes 6 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.
Official text
(11) Alternative methods of compliance for installation, removal, repair, and maintenance of certain roofing and pipeline coating materials. Notwithstanding any other provision of this section, an employer who complies with all provisions of this paragraph (g)(11) when installing, removing, repairing, or maintaining intact pipeline asphaltic wrap, or roof flashings which contain asbestos fibers encapsulated or coated by bituminous or resinous compounds shall be deemed to be in compliance with this section. If an employer does not comply with all provisions of this paragraph (g)(11) or if during the course of the job the material does not remain intact, the provisions of paragraph (g)(8) of this section apply instead of this paragraph (g)(11). 2 citations
(i) Before work begins and as needed during the job, a competent person who is capable of identifying asbestos hazards in the workplace and selecting the appropriate control strategy for asbestos exposure, and who has the authority to take prompt corrective measures to eliminate such hazards, shall conduct an inspection of the worksite and determine that the roofing material is intact and will likely remain intact. 1 citations
(ii) All employees performing work covered by this paragraph (g)(11) shall be trained in a training program that meets the requirements of paragraph (k)(9)(viii) of this section. 1 citations
(iii) The material shall not be sanded, abraded, or ground. Manual methods which do not render the material non-intact shall be used.
(iv) Material that has been removed from a roof shall not be dropped or thrown to the ground. Unless the material is carried or passed to the ground by hand, it shall be lowered to the ground via covered, dust-tight chute, crane or hoist. All such material shall be removed from the roof as soon as is practicable, but in any event no later than the end of the work shift.
(v) Where roofing products which have been labeled as containing asbestos pursuant to paragraph (k)(8) of this section are installed on non-residential roofs during operations covered by this paragraph (g)(11), the employer shall notify the building owner of the presence and location of such materials no later than the end of the job.
(vi) All removal or disturbance of pipeline asphaltic wrap shall be performed using wet methods.
Source: eCFR, text current as of 2026-10-15. Read all of 1926.1101.
Where and how often it was cited
Free toolbox talk
A 5-minute crew talk on 1926.1101(g)(11), plus alerts when this rule changes. Free.
OSHA interpretation letters
- Asbestos Standard – Class III Work (2017-08-15)
- Asbestos training for removing asphaltic coatings from utility pipes (2014-05-19)
Related parts of this rule
- 1926.1101(g) Methods of compliance 297 citations
- 1926.1101(g)(1) 105 citations
- 1926.1101(g)(8) Additional Controls for Class II work 71 citations
- 1926.1101(g)(7) Work practices and engineering controls for Class II work 40 citations
- 1926.1101(g)(5) Specific control methods for Class I work 29 citations
- 1926.1101(g)(8)(i) 28 citations
- 1926.1101(g)(7)(i) 25 citations
- 1926.1101(g)(8)(ii) 18 citations
- 1926.1101(g)(1)(ii) 16 citations
- 1926.1101(g)(4) Class I Requirements 15 citations
- 1926.1101(g)(5)(i) 15 citations
- 1926.1101(g)(8)(iii) 15 citations
Get your crew competent
Trainers on Black Belt Safety: Marc Harvey, Dana Reyes
Trainers and suppliers: feature your business on this rule for $25/month.
About this page
Sources
- 29 CFR 1926.1101 (eCFR), text current as of 2026-10-15
- U.S. Department of Labor enforcement data: OSHA inspections, citations and accident records, copied nightly; data as of 2026-10-20
3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.
