1 open case OSHA company record
Rfx2024xrs480x0115 - Dcs Contracting, Inc. OSHA inspections, violations & penalties · Queen Creek, AZ
- Inspections since 2023
- 1
- Citations
- 1
- Current penalties
- $161,323
- Willful
- 1
- Repeat
- 0
Rfx2024xrs480x0115 - Dcs Contracting, Inc. had 1 OSHA inspection since 2023, with 1 citation and $161,323 in current penalties. That includes 1 willful and 0 repeat citation. The most-cited rule is 29 CFR 1926.652, Requirements for protective systems (1 citation). One case is still open, so penalties may change.
Work at Rfx2024xrs480x0115 - Dcs Contracting, Inc.?
Get a free training plan for the 1 rule OSHA cited here
We match each citation to the training that covers it and send a plan with pricing for your crew. Free, no obligation.
Black Belt Safety is not part of OSHA and cannot change or remove a record.
OSHA inspections at Rfx2024xrs480x0115 - Dcs Contracting, Inc.
Open any inspection for its cited standards, penalties and abatement dates.
| Opened | Inspection | Type | Status | Citations | Current penalty |
|---|---|---|---|---|---|
| March 26, 2024 | 347386302 | Accident | Open | 1 | $161,323 |
Penalties by citation type
OSHA standards Rfx2024xrs480x0115 - Dcs Contracting, Inc. was cited for
Each rule links to its plain-English page with the official text, how often OSHA cites it nationwide, and training that covers it.
1 citation · $161,323
Requirements for protective systems
Course: Trenching and Excavation Safety for Workers (Caught-In/Between) →Prevent the next citation
Most of these citations trace back to training, competent-person oversight and written programs. Fix those before OSHA arrives.
Questions about Rfx2024xrs480x0115 - Dcs Contracting, Inc.’s OSHA record
How many times has OSHA inspected Rfx2024xrs480x0115 - Dcs Contracting, Inc.?
OSHA records list 1 inspection of Rfx2024xrs480x0115 - Dcs Contracting, Inc. in Queen Creek, AZ since 2023.
How much has Rfx2024xrs480x0115 - Dcs Contracting, Inc. been fined by OSHA?
Since 2023: $161,323 in initial proposed penalties and $161,323 in current penalties across 1 citation. Open cases can still change.
What OSHA violations has Rfx2024xrs480x0115 - Dcs Contracting, Inc. been cited for?
Most-cited sections since 2023, with citation counts: 29 CFR 1926.652 (Requirements for protective systems): 1.
What do willful and repeat OSHA citations mean?
A willful citation means OSHA found the employer knowingly failed to comply or acted with plain indifference to worker safety. A repeat citation means the employer was cited for the same or a substantially similar hazard within the last five years. Both carry the highest penalties OSHA can propose.
Has Rfx2024xrs480x0115 - Dcs Contracting, Inc. had an OSHA fatality or accident inspection?
The records list 1 accident or fatality/catastrophe inspection since 2023. The inspection type alone does not establish the cause; see each inspection and the final case outcome on osha.gov.
Is this the same company as other Rfx2024xrs480x0115 - Dcs Contracting, Inc. locations?
Not necessarily. OSHA publishes records by establishment, so this page covers Queen Creek, AZ only. Names merged here: RFX2024XRS480X0115 - DCS CONTRACTING, INC..