29 CFR 1910 · General Industry · Subpart Q

1910.252(c)(2): Ventilation for General Welding and Cutting

By Black Belt Safety Editorial Team Official text as of October 15, 2026 Data updated October 24, 2026 3 min read

In plain words:

Employers must provide mechanical ventilation for welding or cutting on metals not covered in (c)(5) through (c)(12) when work is in a space of less than 10,000 cubic feet per welder, a room with a ceiling under 16 feet, or confined spaces or areas where structures block cross ventilation. The minimum rate is 2,000 cubic feet per minute per welder unless local exhaust or approved airline respirators are provided.

Key takeaways

  • 1910.252(c)(2) is part of OSHA's general industry standards (29 CFR Part 1910, Subpart Q).
  • OSHA cited it 17 times in the last 3 years, in 16 inspections, with $46,320 in current penalties.
  • Most citations: MI (4), VA (2), MN (2).
  • Related part: 1910.252(c) Health protection and ventilation (72 citations).
  • Free 5-minute toolbox talk for your crew below.
17citations, 3 years
$46,320current penalties
16inspections
0linked injury cases
In this article
  1. What this rule covers
  2. Official text
  3. Where and how often it was cited
  4. Free toolbox talk
  5. OSHA interpretation letters
  6. Related parts of this rule
  7. Get your crew competent
  8. Frequently asked questions
  9. About this page

What this rule covers

29 CFR 1910.252(c)(2) ("Ventilation for general welding and cutting") is one requirement inside 1910.252 General requirements, an OSHA general industry standard (Part 1910, Subpart Q). It includes 5 sub-paragraphs. The official text below is copied word for word from the Electronic Code of Federal Regulations (eCFR). The numbers, injury cases and training on this page show how OSHA enforces it on real job sites.

Official text

(2) Ventilation for general welding and cutting — 17 citations

(i) General. Mechanical ventilation shall be provided when welding or cutting is done on metals not covered in paragraphs (c)(5) through (c)(12) of this section. (For specific materials, see the ventilation requirements of paragraphs (c)(5) through (c)(12) of this section.) Open (c)(2)(i) 14 citations

(A) In a space of less than 10,000 cubic feet (284 m3) per welder. 1 citations

(B) In a room having a ceiling height of less than 16 feet (5 m). 2 citations

(C) In confined spaces or where the welding space contains partitions, balconies, or other structural barriers to the extent that they significantly obstruct cross ventilation. 2 citations

(ii) Minimum rate. Such ventilation shall be at the minimum rate of 2,000 cubic feet (57 m3) per minute per welder, except where local exhaust hoods and booths as per paragraph (c)(3) of this section, or airline respirators approved by the Mine Safety and Health Administration and the National Institute for Occupational Safety and Health, pursuant to the provisions of 30 CFR part 11, are provided. Natural ventilation is considered sufficient for welding or cutting operations where the restrictions in paragraph (c)(2)(i) of this section are not present. 3 citations

Source: eCFR, text current as of 2026-10-15. Read all of 1910.252.

Where and how often it was cited

YearCitations
20248
20255
20264

Top states: MI (4), VA (2), MN (2), RI (2), NY (2)

Largest penalties

EmployerLocationPenalty for this rule
EMI ACQUISITION COMPANY INC.CRANSTON, RI$11,585
LUCAS-MILHAUPT WARWICK LLCWARWICK, RI$8,863
108636 - STILLWELL INCBURNSVILLE, MN$8,000
WATSON MCDANIEL COMPANYPOTTSTOWN, PA$5,554
AMERICAN MARITIME SERVICES OF NJ INC.FAIRBURN, GA$5,162

Free toolbox talk

A 5-minute crew talk on 1910.252(c)(2), plus alerts when this rule changes. Free.




OSHA interpretation letters

None exist. OSHA has not published a letter of interpretation for 1910.252(c)(2).

Related parts of this rule

Get your crew competent

Trainers on Black Belt Safety: Marc Harvey, Dana Reyes

Trainers and suppliers: feature your business on this rule for $25/month.

Frequently asked questions

When is mechanical ventilation needed for welding?

In a space of less than 10,000 cubic feet per welder, a room with a ceiling height of less than 16 feet, or confined spaces or areas where structural barriers significantly obstruct cross ventilation.

What is the minimum ventilation rate?

2,000 cubic feet per minute per welder, unless local exhaust hoods and booths or approved airline respirators are provided.

When is natural ventilation enough?

When none of the restrictions listed in paragraph (c)(2)(i) are present.

About this page

Sources

3-year window. Federal OSHA only; state-plan rules are not counted. Plain-language text is a summary, not legal advice; the official text controls. Black Belt Safety is not part of OSHA or the Department of Labor.

Written and reviewed by

Black Belt Safety Editorial Team

Site Safety Officer and Safety Professional

OSHA 30 · CPR · USACE CQM

Written and reviewed by the Black Belt Safety team. Every post is checked against the OSHA standard or agency source it cites.

Scroll to top